Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4145345 |
|---|---|
| Organisation Name | Rural Engineering Department |
| Tender Brief | Corrigendum : Construction Of An Interlocking Road From The Vicinity Of Paradise Hotel (nh-9) Up To Sadullapur. |
| Last Date For Submission | 29th May, 2026 |
| Opening Date | 29 May, 2026 |
| Document Cost | 2354.00 |
|---|---|
| EMD | 95000.00 |
| Estimated Cost | 4748000.00 |
| City | Moradabad |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Construction of embankment with approved materials obtained from borrow pits with a lift up to 1.50m,transporting to site,spreading greading to required slop and compacting to meet requirment of table-300.1 and 300.2 with a lead up to 1000m. As per TSC.301.5 | 833.00 | Cum |
| 2 | L/o granular sub base by providing well greaded materials speading in uniform layers with motor greader / Tractor mounted appropriate equipment complete in all respects. | 267.00 | Cum |
| 3 | Providing Laying spreading and compecting stone aggregate of specific sizes 22.4 to 53 mm to WBM specification i/c spreading in uniform thick. Layer use crushable scrining to fill up the interstics of coarse aggregate watering & compacting in stages to get required density by 80-100KN three wheel static rollar as per T.S.C-405 | 200.25 | Cum |
| 4 | Construction of information pillar in B/W with 1:4 cement & C.sand mix mortar 1.20m wide ,1.35 high i/c grenite stone (2*3 ft) size also include printing of latters finished with plaster complete . | 1.00 | job |
| 5 | Providing supply and fixing of 80mm thick ruber moulded vibratory Interlocking tiles by high pressure and controlled vibration machine having plain dimension 200 X (160+120mm)with minimum 5mm thick topping of O.P cement mixed with 25% marble powder the compressive strength of concrete paver blocks shall not be less than 300 mpa and 4.5 kg/ton including levelling and dressing filling joints with local sand over G.S.B and also including cost of all materials. Labour excluding cost of G.S.B and T&P etc requred for proper completion of work as per direction of engineer-in charge, and T& P ete. [as per MORD 1500] | 2670.000 | sqm |
16 Days Left