| Tender ID | 4145459 |
|---|---|
| Organisation Name | Rural Engineering Department |
| Tender Brief | Corrigendum : Construction Of Interlocking Tiles And Drainage Systems In Village Nasirpur, Extending From The Panchayat Ghar, Passing By Chamunda, Towards Khemsingh Shiva Temple And Dhanora Road. |
| Last Date For Submission | 29th May, 2026 |
| Opening Date | 29 May, 2026 |
| Document Cost | 2354.00 |
|---|---|
| EMD | 91000.00 |
| Estimated Cost | 4526000.00 |
| City | Moradabad |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Providing Laying spreading and compecting stone aggregate of specific sizes 22.4 to 53 mm to WBM specification i/c spreading in uniform thick. Layer use crushable scrining to fill up the interstics of coarse aggregate watering & compacting in stages to get required density by 80-100KN three wheel static rollar as per T.S.C-405 | 172.53 | Cum |
| 2 | Construction of information pillar in B/W with 1:4 cement & C.sand mix mortar 1.20m wide ,1.35 high i/c grenite stone (2*3 ft) size also include printing of latters finished with plaster complete . | 1.00 | job |
| 3 | Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead up to 50 m as per Technical Specification Clause 302.3 | 114.58 | Cum |
| 4 | Concrete with 4cm Guage brick ballast fine sand of 1.25F:M and cement in proportion of 1:6:12 in foundation and under floors including supply of all meterials labour and T&P etc requied for proper completion of work S.I NO 273 | 41.58 | Cum |
| 5 | Providing supply and fixing of 80mm thick ruber moulded vibratory Interlocking tiles by high pressure and controlled vibration machine having plain dimension 200 X (160+120mm)with minimum 5mm thick topping of O.P cement mixed with 25% marble powder the compressive strength of concrete paver blocks shall not be less than 300 mpa and 4.5 kg/ton including levelling and dressing filling joints with local sand over G.S.B and also including cost of all materials. Labour excluding cost of G.S.B and T&P etc requred for proper completion of work as per direction of engineer-in charge, and T& P ete. [as per MORD 1500] | 2300.400 | sqm |