Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 5925365 |
|---|---|
| Organisation Name | Northern Railway |
| Tender Brief | Supply, Installation And Commissioning Of Block Proving Axle Counter Using Block Panel And Ufsbi For Double Line Operation As Per Rdso Specification No. Irs : S-105/2025 Version 1 Or Latest Amendment. Each Set Consisting Of Following: 1-universal Fail Safe Block Interface For Double Line As Per Rdso Spec.no.irs:s. 104/2012 With Latest Version And Amdt. It Shall Have Auto Changeover Facility For Quad And Optical Fiber Cable/voicechannel, Necessary Modem For Quad And Optical Fiber Cable/voice Channel To Be Supplied Along With Auto Changeover Arrangement. Quantity Of This Item -02 No In One Set. 2- Block Panel Complete With All Accessories As Per Rdso/s/32017 With Latest Amdt Qty-02 No. 3- Relay Rack With Double Locking And Sealing Arrangement As Per Rdso Drg No. Rdso/s/32018 Including Relays For Each Relay Rack (qn1-19 No., Qna1-07no, Ql1-02 And Timers-1 No). Quantity Of This Item - 02no In One Set. 4- Block Telephone With Accessories As Per Rdso Spec.no. Rdso/spn /191/2000 Or Latest (the Block Phone Should Work Without Any Interruption After Auto Changeover). Quantity -2no. 5- Supply Of Reliability Improvement Kit Suitable To Work With Ufsbi As Per Rdso/spn/147/2005 Or Latest. It Comprises (a) Automatic Media Changeover Of Modem Working On Redundant Channel For Data Transmission On Optical Fiber Cable Quad Micro Wave Radio (any Two Media)-1pair (b) Secondary Modem For Ufsbi For Use With Secondary Media Optical Fiber Cable/quad/voice Channel=1pair (c) Power & Data Spd: Type C & D: Power Line (vf 24 Ac/dc-2no, V20c/3ph 150v-2no) & Data Line Spd(mdp 4d/5t- 2no). (d) Power Monitor And Soft Start Unitpmss - 1 Pair. [ Warranty Period: 30 Months After The Date Of Delivery ] |
| Last Date For Submission | 13th Oct, 2026 |
| Opening Date | Refer to Documents |
| Document Cost | 0.00 |
|---|---|
| EMD | 0.00 |
| Estimated Cost | 0.00 |
| City | Moradabad |
|---|---|
| State | Uttar Pradesh |
8 Days Left