Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 5096556 |
|---|---|
| Organisation Name | Roads And Buildings Department |
| Tender Brief | Empanelment Of Consultant For Preparation Of Estimate Of Roads Works, Bridge Works And Building Works Under Jurisdiction Of Panchayat (r&b) Division Morbi |
| Last Date For Submission | 6th Aug, 2026 |
| Opening Date | Refer to Documents |
| Document Cost | 1500.00 |
|---|---|
| EMD | 50000.00 |
| Estimated Cost | 0.00 |
| City | Morbi |
|---|---|
| State | Gujarat |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | BUILDING SECTION | 0.000 | 0 |
| 2 | (Building Work) Survey and Preparingcampus plan drawing (Using totalstation) details of all existingbuilding structure plan, boundary,location of utility like electricity,drainage, water supply etc. of treesetc. and submitting all details insoft copy in PDF and hard copy inAutoCAD drawing above 2010version. | 1.000 | Per SQFOOT |
| 3 | (Building Work) Preparing Estimatefor construction of newbuilding(with all necessary ancillary work)including scrutinizing the estimateas per instruction of sanctionedauthority with all requirednecessary drawing and otherdetails the required RA andQuotation etc. (Submitting alldetails in soft copy in PDF and hardcopy) including getting TechnicalSanction | 1.000 | Percentage ofEstimatecost |
| 4 | (Building Work) Preparing Estimatefor repairing of existing building asper instruction of Engineer incharge (with all necessary ancillarywork) including scrutinizing theestimate as per instruction ofsanctioning authorities with allrequired necessary drawings otherdetails the required RA andQuotation etc. (Submitting alldetails in soft copy in PDF and hardcopy) including getting TechnicalSanction | 1.000 | Percentage ofEstimatecost |
| 5 | (Building Work) Preparing Estimatefor Dismantling building as perinstruction of Engineer in charge(with all necessary ancillary work)including scrutinizing the estimateas per instruction of sanctioningauthorities with all requirednecessary drawings other detailsthe required RA and Quotation etc.(Submitting all details in soft copyin PDF and hard copy) includinggetting Technical Sanction | 1.000 | Percentage ofEstimatecost |
10 Days Left