Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3837859 |
|---|---|
| Organisation Name | Narmada Water Resources Water Supply And Kalpsar Department |
| Tender Brief | Engineering, Procurement And Construction (epc) Contract For Providing Irrigation Water For Filling Of Various Ponds/water Bodies (34-villages) Of Wankaner Taluka, District-morbi Through Pipeline By Lifting Water From L3p3 (near L3p3 Pumping Station) Including Supplying And Laying M.s And H.d.p.e. Pipeline Of Different Dia With All Allied Works Etc. Complete Including Operation And Maintenance Of The Commissioned Project For 10 Years. |
| Last Date For Submission | 24th Apr, 2026 |
| Opening Date | Refer to Documents |
| Document Cost | 18000.00 |
|---|---|
| EMD | 15983000.00 |
| Estimated Cost | 1598284796.77 |
| City | Morbi |
|---|---|
| State | Gujarat |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Manufacture, supply & delivery of submerged arc spiral welded MS Pipe with inside lining food grade solvant free epoxy of 406 micron thickness & outside 3 LPE (min 3.7 mm thick) Coating of following thickness having beveled ends plate or coil confirming to IS-3589-2001 or its latest revision/ ammendment for following thickness & outside diamenter at Departmental store/ site including Providing,Laying/ Fixing & Jointing the specials anywhere in the Project area including all taxes, insurance, transportation, freight charges, Octroi, inspection charges, loading, unloading, conveyance to Department store/ sites, stacking etc complete as instructed by Engineer incharge including Excavation for pipe trench incl. all safety provisions using site rails and stacking excavated stuff up to a lead directed by Engineer in Charge, Cleaning the site etc. complete for all lifts and all strata, Lowering & laying in position to correct line & level, Joint coating with HSS. The rates include conveyance from store to site of work loading, unloading,selected excavated earth bedding, jointing, hydrotesting etc complete & Refilling the Pipeline trenches incl. ramming, watering, consolidating deposal of surplus stuff as directed within Project area including providing and fixing pipe indicators at every 1 km distance & The statutory charges for standing crop compensation, permission, miscellaneous charges, co-ordination Liasoning and getting ROU/ROW permissions for laying pipeline as per alignment etc. are to be paid by the contractor. as per approved design and drawing by Engineer in Charge or his Authorised Representative.For Following Diameter of MS PipesMS 508 mm dia., Thk 5 mm | 16900.000 | rmt |
| 2 | MS 559 mm dia., Thk 6.3 mm | 13500.000 | rmt |
| 3 | MS 660 mm dia., Thk 6.3 mm | 16600.000 | rmt |
| 4 | MS 914 mm dia., Thk 7.3 mm | 3900.000 | rmt |
| 5 | MS 1219 mm dia., Thk 8.4 mm | 5400.000 | rmt |
29 Days Left