Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4366499 |
|---|---|
| Organisation Name | Mormugao Port Trust |
| Tender Brief | Annual Maintenance Rate Contract For General Repairs And Maintenance Works As And When Required For A, B, C And D-type Buildings, Schools, Port Hospital And Other Port Buildings At Headland For A Period Of One Year 2026-2027 |
| Last Date For Submission | 10th Jun, 2026 |
| Opening Date | 11 Jun, 2026 |
| Document Cost | 2360.00 |
|---|---|
| EMD | 50000.00 |
| Estimated Cost | 4396178.00 |
| City | Mormugao |
|---|---|
| State | Goa |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earthwork in excavation in dense or hard soil/murrum, soft rock with earth pocket and boulders, Hard rock including removal of obstructions such as small trees, vegetation etc. and removal of excavated material up to a lead of 50m and a lift of 1.5m including refilling foundation trenches. All labour and material etc. complete. | 5.00 | Cubic metre |
| 2 | Earthwork excavation in hard rock, laterite boulders interspersed with murrum etc. including removal of obstruction such as small trees, vegetation etc., refilling the trenches with suitable excavated material or earth removed from nearby areas and removal of unsuitable excavated material up to a lead of 50m and a lift of 1.5 m. All labour and material etc. complete. | 2.00 | Cubic metre |
| 3 | Earth filling in plinth and under flooring with suitable available excavated earth including depositing in layers not exceeding 20 cm., consolidating watering and ramming complete. All labour and material etc. complete. | 2.00 | Cubic metre |
| 4 | Dismantling and clearing of cement concrete of waterproofing ..etc. in trap stone metal without causing any damage to the structure, clearing the dismantled materials and stacking within a lead of 100 m including all lift , cleaning surface, etc. as directed. All labour and material, tools & plant etc. complete. | 2.00 | Cubic metre |
| 5 | Demolishing RCC work in trap stone metal including stacking of serviceable material and disposal of unserviceable material within a lead 0f 100m including all tools & plant , labour, material ,providing props ,scaffoldings etc. complete. | 2.00 | Cubic metre |
5 Days Left