Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Mormugao Port Trust
Tender ID3489078
Organisation NameMormugao Port Trust
Tender BriefCorrigendum : Maintenance Dredging At Mormugao Port For The Year 2026-27
Last Date For Submission8th Apr, 2026
Opening Date09 Apr, 2026
Cost
Document Cost11800.00
EMD3625000.00
Estimated Cost362500000.00
Location
CityMormugao
StateGoa

Register to see full details

BOQ Items
#ItemQtyUnits
1Maintenance dredging of Navigational Channel,approach to and alongside of berth nos.4, 5A 6A,7,8,9,10,11, Breakwater and Mole berths, Inner Turning Circle, higher patches of Outer Turning Circle, Outer Channel from A1 TO A5 areas Mooring dolphins MD1 to MD3 areas as per the scope of work given in the tender conditions. The depths required varies from (-) 8.0m to (-)14.50 mts below Chart Datum in all types of soil as existing including loose or compacted sand, silt mixed with/without clay or soft clay or any other material including boulders, spilled cargo, broken concrete pieces/ debris metal pieces/scrap, rubber tyres, but excluding hard rock by suitable machinery/ equipment without disturbing/damaging the berthing structures and other structures including removal and covering the dredged material and dumping the same in the designated offshore dumping areas at an approximate distance of 3.50 nautical miles from the Breakwater as per the conditions of contract and as directed by the Engineer including all lead, lifts, cost of surveying plants, equipment, tools, labour, consumable, fuels, including mobilisation and de-mobilisation of suitable size of TSHD & flotilla , etc. complete2500000M3
2Note1:Cordinates of Dumping / Spoil ground are as per Annexure 19 Note 2: Idle time charges at Rs 12500/- per 1000 m3 TSHD capacity per hour are applicable. "Note 3: The total accessed quantity is approximate 25 Lakhs cubic metre. Note 4: Quoted Rate shall not include GST, however applicable GST will be payable to the Contarctor. Note 5: The bids will be evaluated only on the quoted rate of item No.1
3Taking away the dredged material by the Contractor if found re-usable based on the soil data provided and paying to Port the cost of the retrieved materials. The dumping of dredged material, storing at yard, treatment of the dredged material and subsequent disposal to prospective users will be the responsibility of the Dredging Firm including taking EC for disposal of dredged material after taking due permission from the competent State Authorities, as required.2500000M3
4Note 1: If the dredged material is found to be re-usable to the bidder than bidder has to quote the rate for this item (item No. 2) otherwise quote the rate as ZERO Note 2: Quoted Rate does not include GST, however applicable GST will be payable to the Contractor Note 3: MPA may or may not operate item No.2.
8th Apr, 2026

13 Days Left