| Tender ID | 4258153 |
|---|---|
| Organisation Name | Village Panchayat |
| Tender Brief | Corrigendum : Providing And Fixing Gi Pipe Railing For The Open Space In Sy. No. 5/1 In Village Chicolna In Ward No. Ii, Borimal Colony, In V.p. Chicolna-bogmalo, Taluka Mormugao Goa |
| Last Date For Submission | 1st Jun, 2026 |
| Opening Date | 03 Jun, 2026 |
| Document Cost | 5000.00 |
|---|---|
| EMD | 15945.00 |
| Estimated Cost | 797249.00 |
| City | Mormugao |
|---|---|
| State | Goa |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | a) Earthwork in excavation by mechanical means (hydraulic excavator)/manual means in foundation pipeline trenches drain (not exceeding 1.5 m in width or 10 sq.m. on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m including getting out the | 46.79 | Cu.m |
| 2 | b)Earthwork in excavation by mechanical means (hydraulic excavator)/manuel means in foundation pipeline trenches drains (not exceeding 1.5M in width or 10 sq.m on plan) including dressing of sides ramming of bottoms lift upto 1.5m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead 50M b)All types of Ordinary rock including all types of laterite rock, blasting prohibited | 41.01 | Cu.m |
| 3 | a)Providing and laying cement concrete 1:3:6(1 cement: 3 coarse sand:6 graded granitic or basaltic stone aggregate 40 mm nominal size) excluding cost of centering, shuttering and finishing in;a)all works upto plinth level. | 5.41 | Cu.m |
| 4 | Providing High yield strength steel reinforcement bar (HYSD)/TMT steel reinforcement bar from secondary producers (Confirming to IS 1786 of 1986) for RCC work including bending, binding & placing in position in all the floors along with the factory made precast concrete cover blocks of specified sizes whose compressive strength is not less than that of surrounding concrete in the structural member. | 204.85 | kgs |
| 5 | a) Providing and laying in position (1:11/2:3) Reinforced cement conrete excluding the cost of centering, shuttering, finishing and reinfrocement (1 cement: 1 coarse sand:3 graded stone agg 20mm nominal size) a)All works upto plinth level | 1.73 | M3 |