Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4083175 |
|---|---|
| Organisation Name | Directorate Of Municipal Administration |
| Tender Brief | Supply, Installation And Maintenance Of Intelligent Transportation Management And Enforcement System Itmes For Muddebihal Town |
| Last Date For Submission | 7th May, 2026 |
| Opening Date | 08 May, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 200000.00 |
| Estimated Cost | 9999999.96 |
| City | Muddebihal |
|---|---|
| State | Karnataka |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Comprehensive maintenance of all installed items as per the BOQ, An amount equivalent to 5% of the total Capital Cost of the project value shall be released annually over 4 years towards the Comprehensive AMC. | 4 | Year |
| 2 | Supply and Installation of LED Curb Stones inserts with inbuilt high-intensity LEDs for enhanced night-time visibility, aesthetic illumination, and improved road safety and lane demarcation.As per the directions of the Engineer in-Charge and As per RFP document | 168 | No |
| 3 | Spring post 450 mm (flexible Bollards)Providing Tubular marker made up of Polyurethane used to divide opposing lanes of road users shall be fixible in nature. Tubular marker having height upto 450 mm shall be having 75 mm Reboundable work zone retroreflective sheeting as per ASTM 4956 S2 (Application of Tubular Marker shall be done as per IRC SP 55 2014) As per the directions of the Engineer in-Charge and as per RFP Document | 50 | No |
| 4 | Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads at 250 g/m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC 35 2015.The finished surface to be level, uniform and free from streaks and holes As per the directions of the Engineer in-Charge and as per RFP Document | 600 | Sqm |
| 5 | Supply and Installation of Convex Mirrors with high-reflective visibility for blind spot coverage and enhanced road safety at intersections and turning points. As per the directions of the Engineer in-Charge and as per RFP Document | 4 | No |
13 Days Left