Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4035569 |
|---|---|
| Organisation Name | Himachal Pradesh Irrigation And Public Health Department |
| Tender Brief | Annual Repair M/o Sewerage Scheme To Sujanpur Town In Tehsil Sujanpur Distt. Hamirpur |
| Last Date For Submission | 23rd Apr, 2026 |
| Opening Date | 23 Apr, 2026 |
| Document Cost | 350.00 |
|---|---|
| EMD | 9668.00 |
| Estimated Cost | 483383.00 |
| City | Multi city |
|---|---|
| State | Himachal Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Demolition above ground level . upto floor two level including stacking of serviceable materials within 20 Metres lead Un-reinforced cement concrete upto 15cm thickness within all leads and lifts complete to the entire satisfaction as directed by the Engineer-in-charge of the site of work. | 40.01 | Per Cum |
| 2 | Excavation in foundation , trenches etc., in all kinds of soil such as pickwork, jumper work blasting work, in soft / hard rock, including chiseling wedging out of rocks clearance of bushes etc.including shoring, dewatering etc. in all leads and lifts stacking the excavated soil upto any lead and lift clear from the edge of excavation and then returning the stacked soil in 15cm layers when required into plinth , sides of foundation etc. consolidating each deposited layers by ramming and watering and then disposing of all surplus earth within all leads and lifts complete to the entire satisfaction as directed by the Engineer-in-charge of the site of work. | 404.98 | Per Cum |
| 3 | Laying, jointing and testing DI pipe with sigpot and socketed clas K-7 IS 8329-2000 jointing with cement mortor within all leads and lifts as per the entire satisfaction of the Engineer-in-charge | ||
| 4 | 150 mm dia | 132.00 | Per Rmt |
| 5 | Providing and laying cement concrete 1:4:8(1 cement:4 sand:8 graded stone aggregate 40 mm nominal size)and curing complete excluding the cost of form work in foundation and plinth in all leads & lifts & to the entire satisfaction of Engineer-in-Charge. | 3.82 | Per Cum |
5 Days Left