Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Public Health Engineering Department
Tender ID3998382
Organisation NamePublic Health Engineering Department
Tender BriefAs Per Boq
Last Date For Submission28th Apr, 2026
Opening Date30 Apr, 2026
Cost
Document Cost1000.00
EMD185700.00
Estimated Cost9285000.00
Location
CityMulti city
StateJammu and Kashmir

Register to see full details

BOQ Items
#ItemQtyUnits
1Setting up of the drilling site by shifting the requisite machinery and allied materials, including making temporary approach arrangements as required at the site.1.000Job
2Boring/drilling of 400 mm diameter gravel packed bore hole for accommodating 200 mm diameter casing/strainer pipe to construct a 200 mm diameter tube well, by suitable method (reverse /direct rotary/percussion), including collection of soil samples from different strata, preparation and submission of strata chart/bore log. The job includes hire charges, running charges, and operation of all necessary equipment, tools and machinery required for proper execution and completion of the work as per specifications.150.000mtr
3Providing, fabricating, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 200 mm dia. 7.1 mm thick liner assembly (Blind) FE 410 beveled-ended M.S. casing pipe, conforming to IS 4270:2001 (for tube wells), of reputed and approved make, including painting of inside and outside surfaces with two coats of approved anti-corrosive paint. The rate shall include handling, loading, unloading, transportation up to the tube well site, as per the directions of the Engineer-in-Charge. The cost also includes third-party inspection of M.S. casing pipe from a Government approved/designated agency.130.000mtr
4Providing, fabricating, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 200 mm dia. 7.1 mm thick liner assembly (Slotted) FE 410 beveled-ended M.S. casing pipe, conforming to IS 4270:2001 (for tube wells), of reputed and approved make, including painting of inside and outside surfaces with two coats of approved anti-corrosive paint. The rate shall include handling, loading, unloading, transportation up to the tube well site, as per the directions of the Engineer-in-Charge. The cost also includes third-party inspection of M.S. casing pipe from a Government approved/designated agency.20.000mtr
5Gravel packing to be done as per the latest IS 4097 and IS 2800, including supply of properly graded gravel of required size, shrouding after lowering of liner assembly and during development of tube well, complete as per direction of Engineer-in-Charge. (To be charged as per actual).35.000cum
28th Apr, 2026

14 Days Left

WhatsApp