Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4448042 |
|---|---|
| Organisation Name | Urban Development Department |
| Tender Brief | Concertina Wire In Janta Row House Park In Ward 30 Under Annual Maintenance Contract |
| Last Date For Submission | 6th Jun, 2026 |
| Opening Date | 08 Jun, 2026 |
| Document Cost | 1000.00 |
|---|---|
| EMD | 5500.00 |
| Estimated Cost | 269007.00 |
| City | Multi city |
|---|---|
| State | Jharkhand |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Supply of 50x50x6mm size M.S. Angle for concertina coil fencing | 1.07 | Per Mt |
| 2 | Labour for fabrication, ercting, hositing and fixing in position structural steel work in R.S. plot, channel, Angle, Tea flat, plate, latric member, builtup compound section in column, grider, stair case or truss including cost of gussel plates, holding down bolts, anchor plates at all heights and depth bolting, weldinf (machine wherever necessary) with applying a priming coat of red lead paint all complete as per approved drawing building specification and direction of E/I. | 1.07 | Per Mt |
| 3 | Providing and fixing concertiana coil fencing with punched tape concertina coil 600mm dia 10 metere openable length (total length 90m) having 50 Nos. rounds per 6 meter length upto 3m height of wall with exisiting angle iron "Y" shaped palced 2.4m or 3.00m apart and with 9 horizontal R.B.T reinforced barbed wire, stud tied with G.I. staples and G.I. clips to retain horizontal including necessary bolts or G.I. barbed wiere tied to angle iron, all complete as per direction fo Rnginee in Charge, with reinforced barbed tape (R.B.T)/ Spring core (2.5mm thick) wire of high tensile strength og 165 kg/sq.mm with tape (0.52mm thick) and weight 43.478 gm/meter (cost of M.S. Angle, C.C. blocks shall be paide separatel) | 310.00 | Per M |
| 4 | of specified grade excluding the cost of centering and shuttering - All work upplinth level (1:3:6) (! Cement : 3 coarse sand (xone-iii) : 6 graded stone aggregated 40mm nominal size) for fixing abgle | 3.19 | Per M3 |
| 5 | Centering and shuttering including strutting, propping etc and removal of form for Foundation, footing, base of columns etc for mass concert side face shuttering | 51.15 | Per Sq.m |
6 Days Left