| 1 | Excavation in all kind of soft/ loose/ hard/dense soils, spoil banks moorum and moorum mixed with boulders and mud including wet excavation dressing, placing the excavated soil neatly in specified dump area or disposing off the same as directed, including cost of dewatering, site clearance, all materials, machinery, labour and dressing, including all lead and lifts etc., complete in all respect as per approved design, specifications and as directed by Engineer-in-charge. | 11,808.49 | cum |
| 2 | Excavation in soft/ disintegrated/ weathered rock including wet excavation, dressing, placing the excavated material neatly in specified dump area or disposing off the same as directed, including cost of dewatering, site clearance, all materials, machinery, labour and dressing, including all lead and lifts etc., complete in all respect as per approved design, specifications and as directed by Engineer-in-charge. | 871.39 | cum |
| 3 | Excavation in hard rock of all toughness (blasting prohibited), placing the excavated rock neatly in specified dump area or disposing off the same as directed, including cost of dewatering, site clearance, all materials, machinery, labour and dressing, including all lead and lifts etc., complete in all respect as per approved design, specifications and as directed by Engineer-in-charge. | 28.80 | cum |
| 4 | Providing and laying M15 grade Plain Cement Concrete design mix using graded aggregate, clean, hard including cost of all materials, machinery, labour, formwork, centering, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing, packing joints of shuttering and all other ancillary operations complete including all lead and lifts. Using aggregate of maximum size. 40 mm in all respect as per approved design, specifications and as directed by Engineer-in-charge. | 2,613.54 | cum |
| 5 | Providing and laying M15 grade Plain Cement Concrete design mix using graded aggregate, clean, hard including cost of all materials, machinery, labour, formwork, centering, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing, packing joints of shuttering and all other ancillary operations complete including all lead and lifts. Using aggregate of maximum size. 20 mm in all respect as per approved design, specifications and as directed by Engineer-in-charge. | 1,865.67 | cum |