Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Water Resources Department
Tender ID3928508
Organisation NameWater Resources Department
Tender BriefConstruction Of Boundary Wall To Ayurvedic Center At Angulia R And R Colony For The Dps Of Village Chamakapur Under Kip
Last Date For Submission15th Apr, 2026
Opening Date16 Apr, 2026
Cost
Document Cost4000.00
EMD5850.00
Estimated Cost584453.00
Location
CityMulti city
StateOdisha

Register to see full details

BOQ Items
#ItemQtyUnits
1Earth work in excavation of foundation in hard soil or gravelly soil with all leads & lifts with shoring and shuttering with working pump if required etc. complete as per the direction of the Engineer-in-charge.10.547Cum.
2Supplying & filling foundation & plinth with sand well watered and rammed including all cost of materials, labour charges etc. complete as per the direction of the Engineer-in-charge.2.109Cum.
3Cement concrete ( 1:3:6) in foundation and floors (i.e below the base course of terrace flooring using 4 cm size black hard crusher broken granite stone metal (free from weathered skinned & debris etc.) of approved quality including cost and conveyance royalities and taxes of all materials and cost of all labour with T& P required for the work complete and as directed by the Engineer-in-charge .2.109Cum.
4R.C.C/C.C work M-20 using 20mm size down graded black hard crusher broken granite chips (free from weathered skinned and debris) etc. including hoisting, lowering, laying and compacting concrete using vibrator watering , and curing for 28days including cost, conveyance, royalities and taxes of all materials & cost of all labour with T&P required for the work etc. complete in all respect but excluding cost of m.s Rod or Tor steel and binding wires and labour charges for bending binding and tying the grill etc. complete and as directed by the Engineer-in-charge11.680Cum.
5Rigid & smooth centering and shuttering for R.C.C./C.C.works including falseworks and dismentaling then after casting including cost of materials etc.complete.a) Foundation footing and column base & plinth beam.58.125Sqm.