Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4370658 |
|---|---|
| Organisation Name | Agartala Municipal Corporation |
| Tender Brief | Construction Of Cc Road With Drain At Near Jamtala Road To H O Sanju Kar At Jamtala Under Ward No10 Annual Maintenance Contract |
| Last Date For Submission | 4th Jun, 2026 |
| Opening Date | 04 Jun, 2026 |
| Document Cost | 1000.00 |
|---|---|
| EMD | 14418.00 |
| Estimated Cost | 720898.00 |
| City | Multi city |
|---|---|
| State | Tripura |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. - All kinds of soil | 78.260 | cum |
| 2 | Providing and laying flat brick soling layer on prepared subgrade according to lines, grades and cross-section shown on the drawing, filling joints with Earth , free from clay with a plasticity Index not exceeding 6, watering and rolling the same with three wheeled road roller 80-100 KN as per MoRD Technical Specification Clause 412. | 24.000 | sqm |
| 3 | Supplying and filling in plinth, under floor, foundations etc. with sand (fine) from local quarry with all lifts including spreading in horizontal layers, watering, grading to required slope, ramming, consolidating and compacting each layer by using plate compactor or by any sutable method complete. | 21.595 | cum |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering. All work upto plinth level 1:3:6 (1 cement: 3 fine sand: 6 graded well burnt brick aggregate 20 mm nominal size). | 9.560 | cum |
| 5 | Providng and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforement 1:1.5:3 (1 cement:1.5 fine sand: 3 graded stone aggregate 20 mm nominal size). | 5.348 | cum |
3 Days Left