| 1 | Excavation in all kind of soft/ loose/ hard/ dense soils, spoil banks moorum and moorum mixed with boulders and mud including wet excavation dressing, placing the excavated soil neatly in specified dump area or disposing off the same as directed, including cost of dewatering, site clearance, all materials, machinery, labour and dressing, including all lead and lifts etc., complete. i/c transportation with all leads and lifts of all materials and as per drawing, specification and as directed by the Engineer- in- charge. | 11,417.878 | cum |
| 2 | Excavation in soft/ disintegrated/ weathered rock including wet excavation, dressing, placing the excavated material neatly in specified dump area or disposing off the same as directed, including cost of dewatering, site clearance, all materials, machinery, labour and dressing, including all lead and lifts etc., complete. i/c transportation with all leads and lifts of all materials and as per drawing, specification and as directed by the Engineer- in- charge. | 7,740.378 | cum |
| 3 | Excavation in hard rock of all toughness (requiring controlled blasting), including control of vibration by use of delay detonators and control of fly-rock by muffling arrangements etc., and placing the excavated rock neatly in specified dump area or disposing off the same as directed, including cost of dewatering, site clearance, all materials, machinery, labour and dressing, including all lead and lifts etc., complete. i/c transportation with all leads and lifts of all materials and as per drawing, specification and as directed by the Engineer- in- charge. | 687.138 | cum |
| 4 | Providing and fixing 25 mm dia. 3 m long High Strength Deformed Steel Bars with one end driven into 38 mm diameter 1.50 m deep hole drilled in bed rock and other end provided with L-bend for embedding in concrete/ masonry of over flow/ non-over flow blocks and other appurtenant works including cost of all materials, machinery, labour, drilling and cleaning hole, filling hole with specified cement mortar, driving anchor rod and all other ancillary operations complete including all lead and lifts. i/c transportation with all leads and lifts of all materials and as per drawing, specification and as directed by the Engineer- in- charge. | 150.00 | No |
| 5 | Providing and laying M15 grade Plain Cement Concrete design mix using graded aggregate, clean, hard including cost of all materials, machinery, labour, formwork, centering, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing, packing joints of shuttering and all other ancillary operations complete including all lead and lifts. - Using aggregate of maximum size. - 40 mm i/c transportation with all leads and lifts of all materials and as per drawing, specification and as directed by the Engineer- in- charge. | 11,516.257 | cum |