Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4035473 |
|---|---|
| Organisation Name | National Rural Employment Programme |
| Tender Brief | Construction Of Four Rooms At High School, Tara, Under Jamua Block |
| Last Date For Submission | 23rd Apr, 2026 |
| Opening Date | 25 Apr, 2026 |
| Document Cost | 5000.00 |
|---|---|
| EMD | 67000.00 |
| Estimated Cost | 3349500.00 |
| City | Multi city |
|---|---|
| State | Jharkhand |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earth work in excavation in foundation trenches in ordinary soil (vide classification of soil item-A)and disposal of excavated earth as obtained to a distance up to 50mts. Including all lift, levelling, ramming the foundation trenches, removing root of treese, shrubs all complete as per approved design, building specification and direction of E/I. | 26.67 | cum |
| 2 | Earth work in excavation in foundation trenches in ordinary soil (vide classification of soil item-A)and disposal of excavated earth as obtained to a distance up to 50mts. Including all lift,levelling,ramming the foundation trenches, removing root of treese, shrubs all complete as per approved design, building specification and direction of E/I. | 40.1 | cum |
| 3 | Providing coarse clean Sand filling in foundat. ion trenches or in plinth including ramming and waterind in layers not exceeding 150mm. Thick with all leads including cost of materials, labour, royalty and taxes all complete as per building specification and direction of E/I | 35.35 | cum |
| 4 | Providing designation 75 B Brick flat soling joints with local sand including cost of water- ing taxes and royalty all complete as per building specification and direection of E/I | 272.29 | sqm |
| 5 | Providing P.C.C (M-150) (1:2:4) in foundation with approved quality of stone Metal of grade !!! (53mm.to 22.4mm.Size) clean coarse sand of F.M. 2.5 to 3.00 inculuding screening ,shuttering, mixing cement concrete in mixer and placing in position vibrating, striking, curing ,taxes and royalty all complete as per building specification and direction of E/I | 22.05 | cum |
5 Days Left