| Tender ID | 3997682 |
|---|---|
| Organisation Name | Himachal Pradesh Irrigation And Public Health Department |
| Tender Brief | Construction of 250mtrs Long Earthen Embankment And Wire Created Apron And Stone Created Pitching From Rd 0 To 125 On Both Side Of Pandoga Nallah To Protect The Vishwkarma Industry, Cultivated Land And Abadies Of Village Pandoga. |
| Last Date For Submission | 20th Apr, 2026 |
| Opening Date | 20 Apr, 2026 |
| Document Cost | 2000.00 |
|---|---|
| EMD | 89048.00 |
| Estimated Cost | 4452384.00 |
| City | Multi city |
|---|---|
| State | Himachal Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Excavation in earth work in all kinds of soil and banking in 20 cm layers i/c breaking clods, ramming, rolling and dressing ground of the purpose of making embankment or filling up ground depression upto all leads and lifts for previous shells as per satisfaction of the Engineer-In- Charge | 2750.00 | cum |
| 2 | Wire creates made of G1 wire filled with boulders with sq cut faces against the wire(boulders filling to be measured & paid for separately) with Gl wire 5.0 mm thick corresponding to (SWG-6) of 15 x 15 cm mesh including entire carriage of materials with in all leads & Lifts. | 4799.89 | Sqm |
| 3 | Wire creates made of GI wire filled with boulders with sq cut faces against the wire (Wire creates to be measured & paid for separately) including entire carriage of materials with in all Leads & lifts. | 337.50 | cum |
| 4 | Providing & Laying Geotextile fillter behind stone pitiching and created apron having thickness of no less than 2.50 mm (Two and half) and minimum weight 275 grams/sqm( two hundred seventy five) suitable with including lap folding and joininting etc. not less than 4.00 mtrs. with complete including entire carriage of materials with in all leads & lifts. | 1750.00 | Sqm |
| 5 | Providing & Laying stone pitiching on side slopes of guide bank and protection work with boulders behind pitiching. Including entire carriage of materials with in all leads & lifts as per instruction of the Engineer-In-Charge. | 262.50 | cum |