Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4074669 |
|---|---|
| Organisation Name | Department Of Agriculture |
| Tender Brief | Construction Of New Godown 1000 Mt |
| Last Date For Submission | 21st May, 2026 |
| Opening Date | 22 May, 2026 |
| Document Cost | 1000.00 |
|---|---|
| EMD | 0.00 |
| Estimated Cost | 119.00 |
| City | Multi city |
|---|---|
| State | Maharashtra |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Warehouse | ||
| 2 | Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 m.beyond the building area & stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering Including shoring and strutting etc. complete. (LIFT UPTO 1.5 M.) By Mechanical Means (PWD S.S.R. 22-23 Item Serial No.726 & Item No.21.02) | 95.200 | Cubic Metre |
| 3 | Excavation for foundation in hard murum including removing the excavated material upto distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.50 m) By Mechanical Means | 71.290 | Cubic Metre |
| 4 | Excavation for foundation in hard murum and boulders including removing the excavated material up to a distance 50 metres, beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.5m.) By Mechanical Mean | 59.410 | Cubic Metre |
| 5 | Excavation for foundation in Hard rock by chiselling, wedging, line drilling, etc.including trimming and levelling the bed, removing the excavated material upto a distance of 50 metres beyond the building area stacking as directed, dewatering and back filling with available earth/ murum watering, ramming etc. complete. (Lift upto 1.5 m). By Mechanical Means | 71.290 | Cubic Metre |
27 Days Left