Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Public Works Department
Tender ID3999629
Organisation NamePublic Works Department
Tender BriefConstruction of Science Lab Gehrwin
Last Date For Submission20th Apr, 2026
Opening Date20 Apr, 2026
Cost
Document Cost350.00
EMD8999.00
Estimated Cost449947.00
Location
CityMulti city
StateHimachal Pradesh

Register to see full details

BOQ Items
#ItemQtyUnits
1Excavation work by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains or overall areas of soil such as pick work, jumper work, pick jumper work, blasting work, jumper blasting work, soft and hard blasting and saturated soil, de-watering, including wedging out rocks where blasting work is prohibted, chiseling and any other mixed variety of soil, including shoring, strutting or bailing out water upto any depth or any height quantum of water including de-watering removal of slush and stacking the serviceable and un-servicable material clear from the edge of excavation as direction of Engineer-in-Charge and returning the stacked soil in 15cm (Fifteen centemetre) layers, when required into plinths, sides of foundation etcetera, consolidating Jeach layer by ramming, watering and then disposing of all excavated earth as directed by the Engineer-in-Charge including carriage of material within all leads, lifts and other incidential as per approved drawing, design and as directed by the Engineer-in-Charge. The rate includes octori, royality, malkhana, toll tax, Goods Service Tax, building and other constrcution worker, welfare cess royalty or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same.52.64Per Cubic Meter
2Providing and laying in cement concrete grade 1:3:6 (one cement isto three coarse sand isto six graded stone aggreate) 20 mm(Twenty milimillter) norminal size grade including the cost of centering and shuttering upto plinth level, including entire carriage of materials in all leads and lifts and as per drawings and 2 technical specifications as per the direction of Engineer-in-Charge. The rate includes octori, royality, malkhana, toll tax, Goods Service Tax, building and other constrcution worker, welfare cess royalty or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same.3.52Per Cubic Meter
3Centering and shuttering including strutting, propping etc. and removal of form work for including entire carriage of materials in all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge. The rate includes octori, royality, malkhana, toll tax, Goods Service Tax, building and other constrcution worker, welfare cess royalty or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same
4Suspended floors, roofs, landings, balconies and access plat form94.29Per Square Meter
5Edges of slab and break in floors and walls under 20cm (twenty centimeter) wide22.60Per Square Meter
20th Apr, 2026

6 Days Left

WhatsApp