Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3999629 |
|---|---|
| Organisation Name | Public Works Department |
| Tender Brief | Construction of Science Lab Gehrwin |
| Last Date For Submission | 20th Apr, 2026 |
| Opening Date | 20 Apr, 2026 |
| Document Cost | 350.00 |
|---|---|
| EMD | 8999.00 |
| Estimated Cost | 449947.00 |
| City | Multi city |
|---|---|
| State | Himachal Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Excavation work by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains or overall areas of soil such as pick work, jumper work, pick jumper work, blasting work, jumper blasting work, soft and hard blasting and saturated soil, de-watering, including wedging out rocks where blasting work is prohibted, chiseling and any other mixed variety of soil, including shoring, strutting or bailing out water upto any depth or any height quantum of water including de-watering removal of slush and stacking the serviceable and un-servicable material clear from the edge of excavation as direction of Engineer-in-Charge and returning the stacked soil in 15cm (Fifteen centemetre) layers, when required into plinths, sides of foundation etcetera, consolidating Jeach layer by ramming, watering and then disposing of all excavated earth as directed by the Engineer-in-Charge including carriage of material within all leads, lifts and other incidential as per approved drawing, design and as directed by the Engineer-in-Charge. The rate includes octori, royality, malkhana, toll tax, Goods Service Tax, building and other constrcution worker, welfare cess royalty or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same. | 52.64 | Per Cubic Meter |
| 2 | Providing and laying in cement concrete grade 1:3:6 (one cement isto three coarse sand isto six graded stone aggreate) 20 mm(Twenty milimillter) norminal size grade including the cost of centering and shuttering upto plinth level, including entire carriage of materials in all leads and lifts and as per drawings and 2 technical specifications as per the direction of Engineer-in-Charge. The rate includes octori, royality, malkhana, toll tax, Goods Service Tax, building and other constrcution worker, welfare cess royalty or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same. | 3.52 | Per Cubic Meter |
| 3 | Centering and shuttering including strutting, propping etc. and removal of form work for including entire carriage of materials in all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge. The rate includes octori, royality, malkhana, toll tax, Goods Service Tax, building and other constrcution worker, welfare cess royalty or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same | ||
| 4 | Suspended floors, roofs, landings, balconies and access plat form | 94.29 | Per Square Meter |
| 5 | Edges of slab and break in floors and walls under 20cm (twenty centimeter) wide | 22.60 | Per Square Meter |
6 Days Left