Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3889672 |
|---|---|
| Organisation Name | Directorate Of Urban Local Bodies |
| Tender Brief | Construction Work For The Ground Floor Of The Office Building Of The Municipal Council, Hamirpur. |
| Last Date For Submission | 4th May, 2026 |
| Opening Date | 05 May, 2026 |
| Document Cost | 17480.00 |
|---|---|
| EMD | 989000.00 |
| Estimated Cost | 0.00 |
| City | Multi city |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Boring with hydraulic piling rigs with power units, providing and installing cast in situ single under reamed piles of specified diameter and length below pile cap in M-25 cement concrete, to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring with bentonite solution and the length of the pile to be embedded in pile cap etc. all complete. (Length of pile for payment shall be measured upto to the bottom of pile cap) :300 mm dia piles | 720.00 | Rm |
| 2 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by Engineer-in- Charge:(All kinds of soil) As per DSR-2.1.1 | 126.98 | Cum |
| 3 | Supplying and filling in plinth with sand under floors, including watering,ramming, consolidating and dressing complete.As per DSR-2.27 | 92.66 | Cum |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources).As per DSR-4.1.8 | 92.66 | Cum |
| 5 | Providing and injecting chemical emulsion for pre-constructional antitermite treatment and creating and chamical bariier under and arround the column pits wall trenches basement excavation top surface if plinth filling junction of wall and floor, along the external perimeter of binding expansion joints, surrounding of pipes and conduit etc. complete (plinth area of the building at ground floor only shall be measured as per I.S. 6313 (Part II 1981) approved material such as Hepthachlor or chlordane will be used. The rate of application of chemical emulsion shall be as follows. | 677.16 | Sqm |
33 Days Left