Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4593846 |
|---|---|
| Organisation Name | Karnataka Neeravari Nigam Limited |
| Tender Brief | Consultancy Service For Feasibility Study And Preparation Of Detailed Project Report For Improvements To Dam By Providing Landscaping, Protection Works, Cafeteria, Children Amusement, Lighting, And Other Improvement Work Of Malaprabha Dam Of Saundhatti Taluk |
| Last Date For Submission | 20th Jun, 2026 |
| Opening Date | 22 Jun, 2026 |
| Document Cost | 630.00 |
|---|---|
| EMD | 43000.00 |
| Estimated Cost | 2497874.74 |
| City | Multi city |
|---|---|
| State | Karnataka |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | SBC Soil test for Office Buildingss | 14 | |
| 2 | The Consultant shall prepare detailed estimates of projects construction cost according to prevailing C.S.R rates and necessary bidding information general conditions of the Contractor and shall assist in the drafting of proposal and Contract forms etc., complete as directed by Engineer-in-charge. | 5 | |
| 3 | The Consultant shall prepare Planning landscape involves to create assessing land, determining best uses, and creating a plan for the layout and features of the landscape, The Consultant shall consult with the Client ,shall confirm such requirements of the project to the Client. The Consultant shall prepare schematic design studies and a report containing general description of the project should be placed for consideration of the Client and their approval etc. as directed by Engineer-in-charge | 3 | |
| 4 | Consultancy for investigation, architectural planning, Structural design, Drawing, preparation of estimate & DTP for construction of office buildings etc., complete as directed by Engineer-in-charge | 2 | |
| 5 | Taking the trial pit for roads, alignment, C.D. Works in earth soil of all sorts, sands gravel, or soft murum, including stacking the excavated material including all lifts and necessary back filling upto depth 3.0 m (Taking the trial pits 90m intervals along approved alignments) | 30 |
7 Days Left