Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4054093 |
|---|---|
| Organisation Name | Directorate Of Urban Local Bodies |
| Tender Brief | Corrigendum : 8-npp Gursarai Ke Antargat Mohalla Katra Naibasti Ward No 24 Me Manish Agrawal Ke Makan Se Chanchal Swaeet House Tak U Tipe Nali Nirman Karya |
| Last Date For Submission | 12th May, 2026 |
| Opening Date | 13 May, 2026 |
| Document Cost | 1076.00 |
|---|---|
| EMD | 66314.00 |
| Estimated Cost | 663136.00 |
| City | Multi city |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Excavation in Foundation in ordinary soil (Loam clay, or sand) including lift upto 1.5 metre (5 fts.) and lead upto 30 m (100 fts) & including filling, watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in-charge upto a distance of 30 m. (100 fts) from the foundation trenches.(S.I. No.251). | 97.20 | Cum |
| 2 | Sand filling in plinth including supply of necessary quantity of sand from a distance not exceeding 8 km.(5 miles) from the site of work and including watering, dressing etc. Rate to include cost of all materials, labour and T&P etc. required for proper completion of the work. (Rate is Including Royality) (S.I. No.255). | 10.80 | Cum |
| 3 | Cement concrete with 4cm gauge approved stone ballast, approved coarse sand, cement in the proportion 8:4:1 including supply of all materials, labour and tools and plants etc. required for proper completion of the work.PCC SI No.281 | 10.80 | Cum |
| 4 | Fly Ash brick work in 1:4 cement and fine sand of 1.25 FM. mortar in foundation and plinth including supply of all materials, labour and T & P etc. required for proper completion of the work.Sl.No-305.Ch-6. | 38.64 | Cum |
| 5 | Cement concrete with 4 cm (1.5") gauge approved stone ballast, approved coarse sand and cement in the proportion of 4 : 2 : I including supply of all materials, labour and T & P etc. required for proper completion of the work. (S.I. No.279). | 5.16 | Cum |
6 Days Left