Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Pune University
Tender ID3817101
Organisation NamePune University
Tender BriefCorrigendum : Annual Maintenance Contract And Repairs For Ladies Hostels Buildings And International Girls Hostels Buildings At The Campus Of Savitribai Phule Pune University
Last Date For Submission17th Apr, 2026
Opening Date20 Apr, 2026
Cost
Document Cost3000.00
EMD25000.00
Estimated Cost2500000.00
Location
CityMulti city
StateMaharashtra

Register to see full details

BOQ Items
#ItemQtyUnits
1Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 m. beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.5 m.) By Mechanical Means1.00One Cubic Meter
2Excavation for foundation in hard murum including removing the excavated material upto distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.50 m) By Mechanical Means Bd.A.2 Page Number 2591.00One Cubic Meter
3Excavation for foundation in Softrock and old cement or lime masonry foundations including removing the excavated material upto a distance of 50 metres beyond the building are and stacking as directed,including dewatering,preparing the bed for the foundation and necessary backfilling with available earth/murum,ramming,watering including shoring and strutting etc. complete (lift upto 1.5m) By Mechanical Means1.00One Cubic Meter
4Excavation for foundation in Soft rock and old cement or lime masonry foundations including removing the excavated material upto a distance of 50 metres beyond the building area and stacking as directed, including dewatering, preparing the bed for the foundation and necessary back filling with available earth/murum, ramming ,watering including shoring and strutting etc. complete. (Lift from 1.5m To 3.0 m.) By Mechanical Means 1.00Cum
5Excavation for foundation in Hard rock by chiselling, wedging, line drilling, etc. including trimming and levelling the bed, removing the excavated material upto a distance of 50 metres beyond the building area stacking as directed, dewatering and back filling with available earth/ murum watering, ramming etc. complete. (Lift upto 1.5 m). By Mechanical Means Bd.A.6 Page Number 2601.00One Cubic Meter
17th Apr, 2026

5 Days Left

WhatsApp