Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3817101 |
|---|---|
| Organisation Name | Pune University |
| Tender Brief | Corrigendum : Annual Maintenance Contract And Repairs For Ladies Hostels Buildings And International Girls Hostels Buildings At The Campus Of Savitribai Phule Pune University |
| Last Date For Submission | 17th Apr, 2026 |
| Opening Date | 20 Apr, 2026 |
| Document Cost | 3000.00 |
|---|---|
| EMD | 25000.00 |
| Estimated Cost | 2500000.00 |
| City | Multi city |
|---|---|
| State | Maharashtra |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 m. beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.5 m.) By Mechanical Means | 1.00 | One Cubic Meter |
| 2 | Excavation for foundation in hard murum including removing the excavated material upto distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.50 m) By Mechanical Means Bd.A.2 Page Number 259 | 1.00 | One Cubic Meter |
| 3 | Excavation for foundation in Softrock and old cement or lime masonry foundations including removing the excavated material upto a distance of 50 metres beyond the building are and stacking as directed,including dewatering,preparing the bed for the foundation and necessary backfilling with available earth/murum,ramming,watering including shoring and strutting etc. complete (lift upto 1.5m) By Mechanical Means | 1.00 | One Cubic Meter |
| 4 | Excavation for foundation in Soft rock and old cement or lime masonry foundations including removing the excavated material upto a distance of 50 metres beyond the building area and stacking as directed, including dewatering, preparing the bed for the foundation and necessary back filling with available earth/murum, ramming ,watering including shoring and strutting etc. complete. (Lift from 1.5m To 3.0 m.) By Mechanical Means | 1.00 | Cum |
| 5 | Excavation for foundation in Hard rock by chiselling, wedging, line drilling, etc. including trimming and levelling the bed, removing the excavated material upto a distance of 50 metres beyond the building area stacking as directed, dewatering and back filling with available earth/ murum watering, ramming etc. complete. (Lift upto 1.5 m). By Mechanical Means Bd.A.6 Page Number 260 | 1.00 | One Cubic Meter |
5 Days Left