Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4429754 |
|---|---|
| Organisation Name | The Fertilisers And Chemicals Travancore Limited |
| Tender Brief | Corrigendum : Annual Maintenance Of Intech Make Electronic Weigh Bridges In Ambalamedu And Q10 Fact Cd For Two Years (2026-2028). |
| Last Date For Submission | 24th Jun, 2026 |
| Opening Date | 25 Jun, 2026 |
| Document Cost | 0.00 |
|---|---|
| EMD | 12000.00 |
| Estimated Cost | 0.00 |
| City | Multi city |
|---|---|
| State | Multi State |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Annual Maintenance of INTECH make Electronic weigh bridges in Ambalamedu and Q10 FACT CD for two years (2026-2028). | ||
| 2 | Comprehensive Annual Maintenance and Service (AMC) for 60T Electronic Weigh Bridge at Q-10, W.Island. CAMC includes the following works:- Comprehensive Annual Maintenance Contract for 60T Electronic Weigh Bridge at Q10, W Island. The work includes on-call visit/ Breakdown visit/ service visit for routine service / calibration /preventive maintenance of weigh bridge throughout the AMC period as per Annexure II Special Terms and condition of the work. | 2 | LS |
| 3 | Comprehensive Annual Maintenance and Service (AMC) for 80T Electronic weigh bridge at Phase-I gypsum yard. CAMC includes the following works:- Comprehensive Annual Maintenance Contract for 80T Electronic Weigh Bridge at Phase-I gypsum Yard, Ambalamedu. The work includes on-call visit/ Breakdown visit/ service visit for routine service / calibration /preventive maintenance of weigh bridge throughout the AMC period as per Annexure II -Special Terms and condition of the work. | 2 | LS |
| 4 | Comprehensive Annual Maintenance and Service (AMC) for 80T Electronic weigh bridge at Phase-II. CAMC includes the following works:- Comprehensive Annual Maintenance Contract for 80T Electronic Weigh Bridge at Phase II, Ambalamedu. The work includes on call visit/ Breakdown visit/ service visit for routine service / calibration /preventive maintenance of weigh bridge throughout the AMC period as per Annexure II -Special Terms and condition of the work. | 2 | LS |
| 5 | Lifting-up& Descending down of the Weighbridge Platform for Inspection works/ Refurbishment/ Painting etc. The work involves:- i) Lifting of the entire Weighbridge platform using hydraulic jack/lifting tools to a specified height (upto 1m) as needed for any Mechanical inspections underneath the platform structure. The platform then shall be supported on Blocks/Supports provided by FACT. ii) Removal of all Load cells (max 8 numbers) from the Weighbridge after proper disconnections at the Load cell junction Box. iii) After the inspection & subsequent related works by FACT, descending the uplifted Weighbridge platform using hydraulic jack/lifting tools. All load cells to be fixed back along with proper connections at the junction Box and routing through the cable pipes. The platform shall be descended to a level just above all the Load cell corners as required for further final alignments. iv) Performing calibration check, corner test v) Checking/ ensuring normal functionality . After completion, the weigh bridge should be handed over to FACT for stamping. | 8 | NO |
6 Days Left