| Tender ID | 4058023 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : Certain E/m Sanctioned Works At Mic And S Under Ge(s) Ahilyanagar |
| Last Date For Submission | 18th May, 2026 |
| Opening Date | 20 May, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 34000.00 |
| Estimated Cost | 1700000.00 |
| City | Multi city |
|---|---|
| State | Multi State |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Supply, installation, testing and commissioning of Split air conditioning unit 1.50 TR (INVERTER TYPE) capacity with HD filter complete with cordless remote control, minimum 5 star labelled,latest energy efficient model eco friendly refrigerant gas,4500 Kcal/Hr,50 Hz,240 volts,air cooled condenser with all accessories varied speed including fixing the outdoor unit on outdoor wall mounting brackets or on stand on terrace as per site requirement and fixing of room(high wall) unit on wall with necessary wall cutting/making hole(core cutting) to pass the refrigerant pipes,drain pipes,cables etc and making good to match with existing finishing complete,providing and making indoor to outdoor communication cable & copper tube connection upto a distance of 3 mtrs as provided by OEM, power cablling (Max 3.0 mtrs from enclosure) to unit, first charging of refrigerant gas including cordless remote, providing drain piping of suitable size from unit upto ground level with proper clamping to wall and covering both drain and rerfrigerant tubes, communication cables through casing capping of minimum size 100X50 mm or as per site requirement inside the room complete all as specified and directed. Make: LG, Daikin, Hitachi, Blue Star | 13.00 | Each |
| 2 | Note for Sl item No 1.00:- 1) The ACs are to be installed in Server rooms equipped with many sophisticated electronic equipments. The rooms are located in different units of MIC&S. Shutdown/ work time permission shall be obtained from the office before starting the work. The contractor shall required to pause the work and resume as per site requirements and complete shut down of the equipments will not be permitted. 2) Due care shall be ensured during the installation work. The wall and floor to be covered with protective sheets to prevent scratches and damages. Dust and debris to be removed properly with vacuum cleaner after completion of work. After work, wall/ panels to be repaired/ replaced and to be match with existing surfaces. 3) The entire work shall be carried out in presence of a qualified supervisor.The Contractor shall visit the site before bidding to check and understand the site feasibilty. No claim shall be entertained on this account after quoting of the tender. | ||
| 3 | Supply and fix Voltage stabilizer for automatic operation, single phase naturally air cooled indoor type & designed for input variation between 170 V to 250 V with output voltage stabilized at 230 V with accuracy of 2.5% and of capacity 3.0 KVA suitable for inverter type AC complete all as specified and as directed. Makes :- Automatic electrical (AE) / Vinitec / APLAB / V Guard / Volina | 13.00 | Each |
| 4 | S&F Copper tubes (size 1/4 inch for liquid line and 1/2 inch for suction line or as per OEM recommendation) including nitrile rubber insulation suitable for 1.5 Ton inverter Split AC including necessary fittings/clamps for fixing on wall and connection to outdoor/indoor units complete leak test as per OEM and all as directed. Note: Suction pipe, discharge pipe with nitrile rubber insulation together shall be measured as one unit. | 19.00 | RM |
| 5 | Taking down carefully by disconnecting and unscrewing from boards/outlet boxes,electric meter from any location and sizes and depositing to MES store yard,maintaining proper records,reading of OLD meters,ser no, date and time of removal and submitted to AGE E/M office complete all as specified and directed. | 150.00 | Each |