Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4484421 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : Cleaning Maint Of Underground / Overhead Sumps And Miscellaneous Works At Bb Cantt, Srinagar |
| Last Date For Submission | 30th Jun, 2026 |
| Opening Date | 07 Jul, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 70000.00 |
| Estimated Cost | 3500000.00 |
| City | Multi city |
|---|---|
| State | Multi State |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | M& L for seven stage cleaning and sterilization of inside the RCC/Steel Underground/Semi underground/Overhead/Sedmentation/Clear water sumps of follwing capacity UG sump/ Semi UG reservoir through bacteriological treatment by using TERBAC G5/ Inchor-5/NB-10/ TERBAC-G-65/Inoxi-60/NB-69 AND ULTRA VIOLET RAY Make: Rays Cleantech/Inus watertech/ Satya enterprises. Seven stages are as under (a) first Stage is to drain out the water by using exit valve or high capacity dewatering system. (b) second stage is cleaning all the algae formation inside the tank by using TERBAC G10/Inoxi-60/NB-69 a laboratory tested branded chemical of the company and scrubbingthe walls of the tanks. (c) Third strage is fresh water cleaning by high speed jet pump (d) Fourth stage and first bacteria screening is decertification by using TERBAC-G5/ Inchor-5/NB-10 a Govt Laboratory certified brannded halogen compound. (e) Firth stage is cleaning the floor of water tank by industrial vaccum cleaner (f) Sixth stage is the second bacterio screening and sterilizing method by using ultra violet ray within the tank and kills all suspended bacteria. (g) Seventh stage of cleaning and third bacteria screening is to sterilize the floor of the water tank by using laboratory certified, branded strong oxidizing agent TERBAC-G65/Inoxi-60/NB-69 | ||
| 2 | NOTE:-(1) Company will submit Govt laboratory test cert of TERBAC-G5/INCHOR-5/NB-10, TERBAC-G65/ INOXII-60/NB-69, before cleaning, fix the sticker mentioning the date of cleaning & Name of site and also provide cert confirming the completion of the sterilization of water tanks mentioning the Name of station and date of cleaning. All the cleaning & sterilization staff should be under accidental insurance coverage. (ii) Outlet pipe of OHT should be plugged before cleaning the OHT to avoid entering scals and the same shall be reconnected after cleaning the OHT and the quoted rate is deemed to include for the revision. (iii) Sterilization team will be comprised of at least 30% members who are minimum 03 months certificate holder in water tanks sterilization. (iv) Contractor will be responsible for rectification of complaints occurred during cleaning the tank. (v) The work shall be carried through specialized agency like Rays Cleantech/ Inus watertech/Satya Enterprise. (vi) The quoted rate inclusive of scaffolding where ever required at site | ||
| 3 | Filter bed 25000 Gins at BWP & R Centre. | 4.00 | EACH JOB |
| 4 | Clear water UG sump 50000 Gins at BWP & R Centre. | 2.00 | EACH JOB |
| 5 | Clear water UG sump 10000 Gins at BWP & R Centre. | 2.00 | EACH JOB |
6 Days Left