Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3746920 |
|---|---|
| Organisation Name | South Eastern Coalfields Limited |
| Tender Brief | Corrigendum : Complete Repairing, Rewinding And Testing Of 04 Nos. Different Rating 3 Phase Squirrel Cage Induction Motor Of Gevra Project. |
| Last Date For Submission | 4th Apr, 2026 |
| Opening Date | 06 Apr, 2026 |
| Document Cost | 0.00 |
|---|---|
| EMD | 9700.00 |
| Estimated Cost | 773599.00 |
| City | Multi city |
|---|---|
| State | Multi State |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Complete repairing, rewinding and testing of 04 nos. different rating 3 phase squirrel cage induction motor of Gevra Project. Scope of work includes: - a) Complete replacement of winding with new 99.96% grade (F - Class insulation copper conductor) as per design. b) Weight of Copper for 04 Motors= 708.48 Kg. Motor Sl no. AUMW450L4 Strip Size- 1.57 x 6.78 mm, no. of coils - 60, weight of one coil - 2.8 kg, Weight of total coils = 168.00 kg Motor Sl no. TVC392055/1 Strip Size- 1.85 x 8.72 mm, no. of coils - 48, weight of one coil - 2.74 kg, Weight of total coils = 131.52 kg Motor Sl no. 183119/1 Strip Size- 1.91 x 6.85 mm, no. of coils - 72, weight of one coil - 2.88 kg, Weight of total coils = 207.36 kg Motor Sl no. 2004092/3 Strip Size- 3 x 5.59 mm, no. of coils - 48, weight of one coil 4.2 kg, Weight of total coils = 201.60 kg c) The rate is inclusive of Cost of insulating materials changing of complete with new insulation (f - Class insulation). d) The rate is inclusive of cleaning, checking, brazing of connections, heating and repairing of bearing sheet of rotor, Painting and testing etc. e) Rate is inclusive of Labour Charges & Contactors profit. f) Scrap materials inclusive copper will be retained by repairer. g) Bidders are requested to thoroughly inspect the job lying at our site before participating in tender. h) All materials shall be routed through Regional Stores. i) To and fro transportation shall be borne by bidder. | 4 | jobs |
| 2 | Total impact of GST for the purpose of CTC | 1.000 | Nos |
3 Days Left