Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3511964 |
|---|---|
| Organisation Name | Public Works Department |
| Tender Brief | Corrigendum : Condition Assessment And Rehabilitation Of The Old Sewerage System At Orleanpet And Rainbow Nagar, Puducherry |
| Last Date For Submission | 15th Apr, 2026 |
| Opening Date | 15 Apr, 2026 |
| Document Cost | 0.00 |
|---|---|
| EMD | 11000000.00 |
| Estimated Cost | 0.00 |
| City | Multi city |
|---|---|
| State | Pondicherry |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Topographical survey to detemine sewer alignment including GL, IL connection sewer/laterals levels MH positions, tracing of buried manholes along alignment, proximity of structures, measurements of exact length between manholes & submission of detailed report and drawings in approved fomat in three sets of hard copy and one set of soft Copy (Before and after execution) | 41,903.00 | metre |
| 2 | Online Sewer Pipeline Inspection & Acoustic profiling by SONAR technology of sewer pipelines in running condition without stoppage of flow using robotic Sewer Trekker platfom for the purpose of silt-level-estimation and diameter measurement including submission of electronic report in 3 sets of DVDs/pendrives and one hard copy. This shall include opening and closing of manholes, insertion and removal of apparatus, traffic diversion, if needed, ensuring all the necessary safety precautions in compliance with PEMS Act, 2013 | ||
| 3 | 150mm to < 450 mm Dia Sewer line | 40,683.00 | metre |
| 4 | 450mm to < 600 mm Dia Sewer line | 1,220.00 | metre |
| 5 | Providing a complete sewer bypassing system including, but not limited to, developing sewer bypassing plan, developing a spill prevention and emergency response plan, submiting and obtaining approval from the Engineer-in-Charge for the sewer bypassing plan and the spil prevention and emergency response plan, implementing the bypassing and spill prevention and emergency response plan, providing bypassing in accordance with the approved plans throughout the duration of the Work including furnishing labor, materials, equipment, and incidentals required to maintain continuous and reliable wastewater service in all wastewater lines during construction, constructing and maintaining temporary bypass sewers to maintain continuous and reliable wastewater flow in all pipes, including individual service connections, removing and disposing off all offensive matter spilled during the bypass pumping as per the instructions of Engineer-in-Charge. |
20 Days Left