Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 5118236 |
|---|---|
| Organisation Name | Cauvery Neeravari Nigam Limited |
| Tender Brief | Corrigendum : Conducting Preliminary Investigation Survey And Preparation Of Detailed Project Report For The Sheme To Lift Water From Doddamagge Tank To Fill 07 Tanks Of Doddamagge Hobli Of Arakalagud Taluk And Extension Of Distribution Network To Individual Tanks Of The Various Series Coming Under Arakalagud 88 Tanks Filling Scheme. |
| Last Date For Submission | 10th Aug, 2026 |
| Opening Date | 11 Aug, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 30000.00 |
| Estimated Cost | 1200358.11 |
| City | Multi city |
|---|---|
| State | Karnataka |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Providing detailed layout plan of area in scale 1in 500 including carrying out contour survey and detailed Engineering plane table Survey with the help of 24 feet Alidade. The dolomite area measurement of the plot and structures, trees, over head line and under ground service amenities within the area, with triagular method and giving detailes of the structures, such as total area, type of building and distance from all corners taking trial pit 0.5x0.5x2.00 m-2Nos per acre and collection | 40.15 | |
| 2 | Graduate Engineer for Strutural Design of Jackwell, Electromechanical Design,Misc Strutures and Canal Strutures Designs and Drawings | 39 | |
| 3 | Graduate Engineer for Hydrological Analysis, design discharge and Hydraulic design of Rising/Gravity Main calculation including alternatives and Strutural Design of Jackwell, Electromechanical Design,Misc Strutures and Canal Strutures Designs and Drawings | 25 | |
| 4 | Preparation of Engineering drawing as strip plan, widening scheme, index / key map, typical cross section, retaining walls, road furniture, general arrangement drawings for bus bays / truck lay-bays / rest areas / toll plaza / booths / and type drawing of pipe/ slab drains etc. on computer using Auto CAD | 40.5 | |
| 5 | Detailed survey of road in plain country including chaining and levelling with cross sections at every two chains inclusive of closing of survey each day | 56.2 |
6 Days Left