Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3938937 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : Constr Of New Simulator Room Alongwith Accessories For Installation Of Infantry Weapon Training Simulator System (12 Lane) At New Long Range Area At Nda Khadakwasla Under Ge (p) Nda Khadakwasla |
| Last Date For Submission | 4th May, 2026 |
| Opening Date | 07 May, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 86000.00 |
| Estimated Cost | 4300000.00 |
| City | Multi city |
|---|---|
| State | Multi State |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Surface excavation n. exc 30cm deep and averaging 15 cm deep and getting out in Soft/Loose soil complete all as specified & as directed by Engineer-In-Charge. | 350.00 | Sqm |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator)/ in foundation trenches or drains (not exceeding 1.5 m in width and depth or 10 sqm on plan), in any kind of soil including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m complete all as specified & as directed by Engineer-In-Charge. | 24.00 | Cum |
| 3 | Earth work in excavation by mechanical means (Hydraulic excavator)/ in foundation trenches or drains (not exceeding 1.5 m in width and depth or 10 sqm on plan), in ordinary rock including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated ordinary rock an disposal of surplus excavated ordinary rock as directed, within a lead of 50 m complete all as specified & as directed by Engineer-In-Charge. | 6.00 | Cum |
| 4 | Earth work in excavation by mechanical means (Hydraulic excavator)/ in foundation trenches or drains (not exceeding 1.5 m in width and depth or 10 sqm on plan), in hard rock where blasting prohibited including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated hard rock and disposal/ stacked of surplus excavated hard rock as directed, within a lead of 50 m complete all as specified & as directed by Engineer-In-Charge. | 3.75 | Cum |
| 5 | Earth work in excavation by mechanical means (Hydraulic excavator)/ in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), in any kind of soil. Add for each additional 1.5 m or part thereof in depth beyond the first 1.5 m including dressing of sides and ramming of bottoms, lift upto 2.1 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m complete all as specified & as directed by Engineer-In-Charge. | 2.75 | Cum |
6 Days Left