| Tender ID | 4525351 |
|---|---|
| Organisation Name | Tamilnadu Cooperative Milk Producers Federation Limited |
| Tender Brief | Corrigendum : Construction Of 60 Mt Weigh Bridge , Milk Reception Dock , Transformer Yard And Water Treatment At 60 Mtpd Powder Plant , Padalur Dairy |
| Last Date For Submission | 1st Jul, 2026 |
| Opening Date | 02 Jul, 2026 |
| Document Cost | 0.00 |
|---|---|
| EMD | 62900.00 |
| Estimated Cost | 0.00 |
| City | Multi city |
|---|---|
| State | Tamil Nadu |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earth work narrow excavation for foundation in all soils and sub soils and to full depth as may be directed except hard rock requiring blasting inclusive of shoring, shuttering and baling out water where ever necessary, refilling the sides of foundations with excabvated earth in layers of not more than 15cm thk watered, well rammed , consolidated and depositing the surplus earth on bank with initial lead of 10m and initial lift of 2m, clearing and leveling the site etc., complete as directed by the federation officers and as per standard specifications. | 160.20 | cum |
| 2 | Supplying and filling with M-Sand in layers of not more than 15cm thick, well rammed, watered and consolidated etc., complete complying with standard specifications and as directed by the departmental officers. | 41.40 | Cum |
| 3 | Plain Cement Concrete 1:4:8 (One Cement, Four M-sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering for flooring and foundation and including side shuttering, compaction, curing etc., complete as directed by the departmental officers. | 52.80 | cum |
| 4 | Supplying and filling with gravel for foundation and basement in layers of not more than 15 cm thick well rammed, watered and consolidated etc to required thickness, etc., completed as directed by the departmental officers. | 24.00 | cum |
| 5 | Supplying , erection and steel centering for all RCC works using M.S Sheet, M.S. angles casurina props C.W.joints for all type of RCC works (ie) beams, roof slab, lintel, column footing, column & roof beam etc., including necessary supports with all cross bracing, filling the slits and holes the reprieved materials should be taken by the contractor and side shuttering etc., complete as directed by the departmental officers - Plain surface- Up to basement | 205.60 | Sqm |