Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4908779 |
|---|---|
| Organisation Name | Public Works Department |
| Tender Brief | Corrigendum : Construction Of A Community Center In Rabupura Gautam Buddha Nagar District, Under The Accelerated Economic Development Scheme For The Financial Year 2025-26 |
| Last Date For Submission | 20th Jul, 2026 |
| Opening Date | 20 Jul, 2026 |
| Document Cost | 944.00 |
|---|---|
| EMD | 165000.00 |
| Estimated Cost | 1639718.00 |
| City | Multi city |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. Including cost of, all material, labour, T&P, Labour cess, all taxes complete. But excluding GST. DSR.No. 15.7.4 | 56.00 | cum |
| 2 | Demolishing R.B. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in- charge. Including cost of, all material, labour, T&P, Labour cess, all taxes complete. But excluding GST. DSR 15.4 | 11.00 | cum |
| 3 | Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead : Including cost of, all material, labour, T&P, Labour cess, all taxes complete. But excluding GST. DSR 15.12.1 | 14.00 | Sqm |
| 4 | Surface dressing of the ground including removing vegetation and inequalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m. Including cost of, all material, labour, T&P, Labour cess, all taxes complete. But excluding GST. DSR 2.28 | 55.00 | Sqm |
| 5 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. Including cost of, all material, labour, T&P, Labour cess, all taxes complete. But excluding GST.DSR SI.No. 2.8.1 | 112.00 | Cum |
4 Days Left