Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4251915 |
|---|---|
| Organisation Name | Deendayal Port Trust |
| Tender Brief | Corrigendum : Construction Of Approach Road For The Proposed Veera Barge Jetty (phase -i) |
| Last Date For Submission | 19th Jun, 2026 |
| Opening Date | Refer to Documents |
| Document Cost | 5900.00 |
|---|---|
| EMD | 15708725.00 |
| Estimated Cost | 785436249.00 |
| City | Multi city |
|---|---|
| State | Gujarat |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. | 22715.000 | M3 |
| 2 | Providing primary rock of 0.1 to 0.5T for road work/ground including cost of quarrying, royalty, loading, unloading, transportation and spreading in layers from existing ground to required level, levelling, dressing side slopes etc., complete with all labour and materials complete including settlement etc., as directed by the engineer in charge.Level | 368000.000 | MT |
| 3 | Supplying and stacking ofQuarry Spall /Ganular Material for Embankment of Approach Roads/Plot with incuding cost of excavation, royalty, loading, unloading transportation complete with all labour and materials or as directed by Engineer in charge | 521600.000 | MT |
| 4 | Laying, spreading, compacting and shifting of Quarry Spalls material with loading, unloading and transporting. The material shall be spread in uniform thickness and compacted in layers using vibratory rollers of 8-10 capacity with watering to achivce proper grade and camber. The work shall include consolidation to meet specified compaction values and surface accuracy, complete in all respects as directed by the EIC | 326000.000 | M3 |
| 5 | Providing and laying Non Pressure NP-4 class (Heavy duty) R.C.C. pipes including collars/spigot jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement : 2 fine sand) including testing of joints etc. complete1200 dia Pipe | 480.000 | RMT. |
14 Days Left