Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Municipal Council
Tender ID4621810
Organisation NameMunicipal Council
Tender BriefCorrigendum : Construction Of Black Top Road Starting From Main Road To Shri. Nimai S House And Shri. Satya Narayan S House At Brichgunj, Ward No.22.
Last Date For Submission30th Jun, 2026
Opening Date30 Jun, 2026
Cost
Document Cost0.00
EMD18843.00
Estimated Cost942167.00
Location
CityMulti city
StateAndaman and Nicobar Islands

Register to see full details

BOQ Items
#ItemQtyUnits
1Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.36.30Cum
2Centering and shuttering including strutting, propping etc. and removal of form work for : Foundations, footings, bases for columns.19.62Sqm
3Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources).6.60Cum
4Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand(zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)8.10Cum
5Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor, etc., up to floor five level, excluding the cost of centering, shuttering and finishing : 1:2:4 (1 Cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)4.50Cum
30th Jun, 2026

7 Days Left

WhatsApp