| Tender ID | 4058495 |
|---|---|
| Organisation Name | Directorate Of Local Bodies |
| Tender Brief | Corrigendum : Construction Of Cc Road And Drain From Satish Kanojia House To Shyamu House Via Nanhu House In Krishna Nagar Ward. |
| Last Date For Submission | 14th May, 2026 |
| Opening Date | 14 May, 2026 |
| Document Cost | 2360.00 |
|---|---|
| EMD | 161825.00 |
| Estimated Cost | 1618254.00 |
| City | Multi city |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Excavation in foundation soil (Loam clay or sand ) including lift upto 1.5 metre (5fts) and lead upto 30 Mtr ( 100fts) & including filling watering and ramming of excavated earth into the tremches or into the space between the building and sides of foundation trenches or into the plinth and removal and disposal of suplus earth as directed Engineer in charge up to distance of 30m (100fts) from the foundation trenches | 44.19 | Cum |
| 2 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15 landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement: 1.5 coarse sand(zone-III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources).As per DSR 5.3 | 14.42 | Cum |
| 3 | Earth in Embankment in ordinary soil i/c lead 30mt. & lift 1.50 mt. As per DAR 2.25(a) | 110.27 | Cum |
| 4 | Construction of granular sub base by providind well graded material spreading in uniform layer with mortar grader on prepared surface , mixed by mix in place mathod with rotavator at OMC , and compaction with smooth wheel roller to achive the desierd dencity complete as per technical specification clause 401. | 52.50 | Cum |
| 5 | Ist class brick work in 1:4 cement & coarse sand mortar in foundation and plinth including supply of all materials, labour, T&P etc. required for proper completion of the work. DSR-6.1.1 | 64.23 | Cum |