Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3988199 |
|---|---|
| Organisation Name | Public Works Department |
| Tender Brief | Corrigendum : Construction Of Following Works In Govt Higher Secondary School Dhangri I. 01 Additional Classroom 14.35 Lac Ii. Physics Room 18.00 Lac |
| Last Date For Submission | 25th Apr, 2026 |
| Opening Date | 27 Apr, 2026 |
| Document Cost | 600.00 |
|---|---|
| EMD | 64700.00 |
| Estimated Cost | 3235000.00 |
| City | Multi city |
|---|---|
| State | Jammu and Kashmir |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:All kinds of soil : | 85.00 | Cum |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 22.00 | Cum |
| 3 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1 :3 (1 cement : 1 coarse sand : 3 graded stone aggregate 20 mm nominal size) | 28.00 | Cum |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering.All works upto plinth level in 1:3:6 (1 cement: 3 coarse sand: 6 graded stone aggregate 20mm nominal size) crushed. | 27.00 | Cum |
| 5 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | 46.00 | Cum |
1 Days Left