Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3794563 |
|---|---|
| Organisation Name | Rural Engineering Department |
| Tender Brief | Corrigendum : Construction Of Inter Locking Road Ward No 45 Chatnag Ustapur Mahmudabad Pakki Road To Mahes Srivastava House |
| Last Date For Submission | 3rd Apr, 2026 |
| Opening Date | 04 Apr, 2026 |
| Document Cost | 2500.00 |
|---|---|
| EMD | 22000.00 |
| Estimated Cost | 1100000.00 |
| City | Multi city |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Construction of Embankment with material obtained from borrow pits for local earth construction of embankment with approved material obtained from abailable land and permitted and approved by Engineer in charge and as per technical specification clause 301.3.4.1 with all lift and leads,spreading,gradding to required slope and copacting to meet requirment of tables 300 land,300.2 as per tech classification 301.5. | 228.75 | cum |
| 2 | Excavation in foundation in ordinary soil (loam clay or sand ) includig lift upto 1.50 metre and lead upto 30 metre . Including filling watering & ramming of excavated earth into the trenches of into the space between the building & the sides of foundation trenches or into the plinth & removal & disposal of surpluse earth as directed by the Engineer incharge upto a distance of 30 m from the foundation trenches. (Excluding Royality Rs. 30 ) As per S.I. No. 251 Excluding GST | 35.70 | cum |
| 3 | Concrete with 40mn gauge B/B, fine sand of 1.25 FM and Cement in proportion of 12:6:1 including supply of all materials, labour and T&P etc. required for proper completion of the work. SI.N0.273 | 8.93 | cum |
| 4 | M-150 Brick work in 1:4 cement & fine sand (1.25 F.M.) mortar morter in foundation and plinth including supply of all materials, labour & tools & plants etc. required for proper completion of the work. Excluding GST. SI No. 305 | 36.62 | cum |
| 5 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density complete as per technical specification clause 401 | 68.00 | cum |
6 Days Left