Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3796731 |
|---|---|
| Organisation Name | Zilla Parishad |
| Tender Brief | Corrigendum : Construction Of Pandals, Sheds, Barricades, Drop Gates To Setup Training Centres, Strong Rooms, Additional Strong Rooms,commissioning Rooms And Other Allied Works Including Temporary Installation Of Mike Sets,generator Sets, Lights, Fans, A/c Machine |
| Last Date For Submission | 28th Mar, 2026 |
| Opening Date | 31 Mar, 2026 |
| Document Cost | 0.00 |
|---|---|
| EMD | 20000.00 |
| Estimated Cost | 0.00 |
| City | Multi city |
|---|---|
| State | West Bengal |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Single slope strong bamboo( 3 to 4 dia) frame work shed with Tarpaulin cover, height 8'-6" to 9'-0" at the end and the post of strong bamboo (4 dia) @ 6'-0 C/C and embedded sufficiently in the ground, supplied fitted fixed with Coir rope with refits runners, ties, stiffeners and crossing etc. of full bamboos runner to be fixed with pillar or posts as protection of work. Nylon / Coir rope and half-split or full bamboo to be fixed on the roof of the shed to avoid the wind blow. The covering must sun/rain water tight, leakage of rain water will not be allowed in any circumstances. The ground to be labeled and dressed before starting of the work and to be completed as per direction of authority.- Three ( 3) Sides Covering A) For Duration of 1(One ) Day | 1 | Sqft. |
| 2 | B) For Duration of 3(Three) Day | 1 | Sqft. |
| 3 | C) For Duration of 7(Seven) Day | 1 | Sqft. |
| 4 | D) For Duration of 15(Fifteen) Day | 1 | Sqft. |
| 5 | Double slope strong bamboo (3 to 4 ) dia frame work shed with Tarpaulin cover hight center 18 -0 and end 12 -0 and embedded sufficiently in the ground supplied fitted fixed with coir rope with refits corners. Ties, stiffening and crossing etc, of full bamboo. A full bamboo runner/Bracing,tie, to be fixed with pillar or post as protection of work Nilon/Coir rope and full bamboo to be fixed on the roof of the shed to avoid the wind blow. The covering must sun/rain water tight, leakage of rain water will no be allowed in any circumstance. The ground to be labeled and dressed before starting the work. With side covering and celing including all labour and other incidental charges. All complete as per direction of Engineer/Officer inchange. Removal of the same after completion of Election process and the fill up the all Dig Hole of bamboo filling by earth and clearing the all respect complete. (Payment wil;l be made on the basis of finished.Area.(Sq.ft./Sqm.) of the structure. A) For Duration of 1(One ) Day | 1 | Sqft. |
2 Days Left