Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Public Works Department
Tender ID3917300
Organisation NamePublic Works Department
Tender BriefCorrigendum : Construction Of Road From House Of Subedar Teesh To Shamshan Ghat In Mohra Patli Panchayat Chowki Handan.
Last Date For Submission15th Apr, 2026
Opening Date16 Apr, 2026
Cost
Document Cost1500.00
EMD116000.00
Estimated Cost5800000.00
Location
CityMulti city
StateJammu and Kashmir

Register to see full details

BOQ Items
#ItemQtyUnits
1Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.: (All kinds of soil 80%, ordinary rock 10% & hard rock by blasting 10%)6963.00Cum
2Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil220.00Cum
3Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size)36.00Cum
4Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)403.00Cum
5Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15 , landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1 :3 (1 cement : 1 coarse sand : 3 graded stone aggregate 20 mm nominal size)11.00Cum
15th Apr, 2026

1 Days Left

WhatsApp