Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Works Department
Tender ID3902670
Organisation NameWorks Department
Tender BriefCorrigendum : Construction Of Transit House In The Existing Gramya Nyayalaya Complex Under Tahasil Ghasipura In The District Of Keonjhar For The Year 2024-25.
Last Date For Submission23rd Apr, 2026
Opening Date24 Apr, 2026
Cost
Document Cost10000.00
EMD82780.00
Estimated Cost8278037.00
Location
CityMulti city
StateOdisha

Register to see full details

BOQ Items
#ItemQtyUnits
1Civil Works Earth work in excavation hard soil in foundation with initial lead and lift including rough dressing and breaking the clods to maximum 5cm to 7cm in size and laying the layers notexceeding 0.30m in depth as per specification and approved by the department.163.42Cum
2Sand filling in foundation and plinth including cost of all material, labour, conveyance, loading and unloading, taxes, royalties, sundries, tools and plants etc. complete as per the driection of the Engineer in Charge.85.44Cum
3Providing & laying plain cement concrete (1:3:6) using 4cm size metal etc. complete including all labour, materials & royality etc. complete as per direction of EIC.48.02Cum
4Brick masonary (1:6) Flyash brick in foundation & plinth including cost of all materials labour T&P etc completed40.47Cum
5Providing lifting, hoisting and laying R.C.C. of M-20 Grade to base of columns and footing, columns, beams, plinth band, lintels, chajja, shaft, fins, roof slabs, balconies, stair cases, parapets, window sills, lofts, railing, jally, copping or in places as shown in the drawing for all floors with 20mm and down graded size black hard crusher broken ships of approved quality from approved quarry including mixing and vibro compacting to proper shape and size, level and plumbs and finishing the exposed surfaces smooth (if required providing plaster with cement mortar (1:4) wherever necessary without any extra cost) including rigid smooth centering and shuttering, scafolding, watering (excluding reinforcement bars) and curing for required period including cost of all material, labour, conveyance, royality, loading and unloading, sundries, tools and plants etc. complete as per the direction of the Engineer in Charge.
23rd Apr, 2026

6 Days Left

WhatsApp