Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4640382 |
|---|---|
| Organisation Name | Water Resources Department |
| Tender Brief | Corrigendum : Construction Of Water Tank For Ganesh Visarjan In P.t Sheet No. 114 Chalta No. 2/1 In Murida In Fatorda Constituency. (re-tender) |
| Last Date For Submission | 6th Jul, 2026 |
| Opening Date | 07 Jul, 2026 |
| Document Cost | 8000.00 |
|---|---|
| EMD | 144080.00 |
| Estimated Cost | 7203792.00 |
| City | Multi city |
|---|---|
| State | Goa |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earthwork in excavation by mechanical means in all types of strata comprising any of the materials such as soil, sand, clay, silt, gravel, moorum of all varieties, shingles, pebbles, all types of conglomerates, laterite rock, soft rock, ordinary rock, disintegrated rock, weathered, fissured/ shattered, decomposed rock and all such other materials either in full or in parts as the case may be adopting any approved method or methods as may be convenient or permitted inclusive of chiseling, wedging etc. in all conditions such as dry, moist, saturated, submerged, foul conditions etc. including setting out construction of shoring and bracing removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling excavated earth to the extent required and disposing of the surplus excavated /rock as directed by the Engineer-in-charge etc. for leads and lifts etc. as specified and directed etc. all complete. | 326.00 | Cum |
| 2 | Rubble packing with hard laterite stone under floors including watering, ramming and consolidating etc. in pipeline trenches and other foundations complete. | 103.00 | Cum |
| 3 | Centering and shuttering including struttings, propping etc. and removal of formwork for : Foundations, footings, bases for columns and mass concrete. | 242.00 | Sq.m. |
| 4 | Providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in: All works upto plinth level. | 239.00 | Cum |
| 5 | In retaining walls , return walls(any thk) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping bed blocks, anchor blocks, plain window sills, fillets etc, upto floor five level. | 187.00 | Cum |
6 Days Left