Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4047317 |
|---|---|
| Organisation Name | Himachal Pradesh Irrigation And Public Health Department |
| Tender Brief | Corrigendum : Demolition And Reconstruction Of Stair Of Baba Kamlahiya Temple At Rd 00 To 090 Mtrs |
| Last Date For Submission | 30th Apr, 2026 |
| Opening Date | 02 May, 2026 |
| Document Cost | 2000.00 |
|---|---|
| EMD | 52120.00 |
| Estimated Cost | 2605535.00 |
| City | Multi city |
|---|---|
| State | Himachal Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Cutting in earth work and disposal of excavated earth upto a lead of 20 mtrs in Pick, jumper work as per direction and to the entire satisfaction of Engineer-in-Charge. | 22.99 | Cum |
| 2 | Excavation in foundation, trenches etc. in all kinds of soil such as pick work, jumper work, blasting work in soft / hard rock, chiselling in soft / hard including wedging out of a rock where blasting is prohibited and stacking the excavated earth up to all lifts, stacking the excavated soil up to all lead clear from the edge of excavation and then returniing the stacked soil in 15 centimeters layers when required in to plinths, sides of foundation etc. consolidating each deposited layer by ramming and waterng and then disposing of all surplus excavated earth as per direction and to the entire satisfation of Engineer- in- charge up to leads and lifts. | 23.45 | Cum |
| 3 | Providing and laying cement concrete 1:2:4 (1 Cement : 2 Sand :4 graded stone aggregate 20mm nominal size) On curing complete excluding cost of form work in foundation and plinth in all lead and lifts as per direction and to the entire satisfaction of the Engineer-in-Charge. | 20.25 | Cum |
| 4 | Square rubble masonary with machine cut/dressed ashlar stone of approved quality i/c racking out of joint in foundation and plinth in retaining walls/breast walls including raking out joints in : Cement Mortar 1:6 ( 1cement : 6 sand) i/c curing complete as per direction and to the entire satisfaction of Engineer-in-Charge. | 33.26 | Cum |
| 5 | Demolation of stone masonary above GL. Upto floor two level including disposal of in serviceable material with in 20 mtrs. Lead | 7.54 | Cum |
2 Days Left