| 1 | Excavation in earth work in hilly area in all heights and depths in all kind of soil by manual/mechanical means including saturated soil comprising of mixed soil, ordinary rock, soft rock and hard rock all work of rock cutting by blasting shall be carried out by taking all necessary precautions against soil erosion, damage to hill side,water pollution, etcetra and to protect stability of hill side track shall be excavated with chiseling and wedging out rock (where blasting is prohibited). all earth work in cutting/excavation including rock excavation shall be carried,out true to lines, grades, side slopes, width, camber super-elevation and level as shown on the drawings or as directed by the Engineer-in-Charge,in conformit with the requirement of MORD technical specification 2014 for Rural Road. clause 300, 1602,1603 of General conditions for contract to achieve designed formation width including hauling and stacking of material useful for construction at suitable sites and safe disposal and dumping to be arranged by the contractor of unsuitable cut materials at his own lavel and no excavated material be thrown/dumped along road side or in nallah as per the guideline of NGT in specified manner,trimming,filling of unevenness,blindage and finishing of the road to specified dimensions or as directed by the Engineer -in -Charge for smooth riding necessary to complete the work by mechanical means/labour it required and nothing etcetra shall be paid on this account. All useful material such as stone shingles, aggregate and slates etcetra shall be sorted out and stacked in proper stacks. The carriage of excavated earth and nothing shall be paid on this account. The removal of slips during the construction period shall be the responsbility of the contractor and nothing extra shall be paid on this account. Any loss to the public and private property during the course of excavation shall be the absolute responsibility of the contractor, which shall compensated by him in all cases. The rates are inclusive octrol, royality, Malkana, toll tax or other taxes but excluding GST imposed by the Government. | 11928.260 | Cubic meter |
| 2 | Earth work in excavation for all type of road structure such as retaining walls, breast walls, culverts, drains and parapets etcetra in all type of classification of soil comprising of ordinary soil , ordinary rocks, hard rocks, chiselling/ wedging out of rocks ( where blasting is prohibited) as per drawings and technical specification MORD 2014 Clause 305 and as per direction of the Engineer-In -Charge including setting out construction of shoring and bracing, removal of stumps and other deleterious materials and disposal of materials upto all leads and lifts including dressing of sides and bottom and back filling in trenches with excavated suitable approved materials to the original surface in layers not exceeding 150mm ( one hundred fifty milimeter) compacted thickness including shuttering and shuttering and pumping and bailing out water (surface and sub soil water) upto all depth and any quantum of water including cleaning of slush which may arise out during dewatering and as per the direction of the Engineer-in-Charge including carriage of material through all modes of transportation within all leads and lifts and other incidentals. The rates are inclusive octrol, royality, Malkana, toll tax , or other taxes but excluding GST imposed by Government. | 9511.710 | Cubic meter |
| 3 | Providing and laying machanically Mixed and vibrated cement concrete 1:6:12 (one cement : six sand : twelve graded crushed/broken stone aggregate 40 mm (forty millimetre nominal size) mechanically mixed and vibrated on ground or under water and curing complete including pumping or bailing out water, dewatering removal of slush as required at site which may arise at the time of laying under water complete for all heights and depths including cost of form work in open foundation and plinth complete as per drawing and MORD technical specification clause 802,803,1202 and 1203 as per direction of Engineer-in- Charge . including carriage of material within all leads and lifts and other incidentals The rates are inclusive octroi , royality , Malkana, toll tax or other taxes but excluding GST imposed by the Government. | 347.300 | Cubic meter |
| 4 | Providing and laying mechanically mixed and vibrated cement concrete 1:5:10 (one cement : Five sand : ten graded crushed / broken stone aggregate 40mm (forty millimeter nominal size) and curing complete including the cost of form work plain concrete on ground or under water and curing complete including pumping or bailing out water, dewatering removal of slush as required at site which may arise at the time of laying under water complete for all heights and depths including cost of form work in open foundation complete in reteaning walls / breast walls as per drawing and MORD technical specifications clause 802,803,1202 and 1203 and as per direction of Engineer-in- Charge including entire carriage of material with in all leads and lifts and other incidentals . The rates are inclusive octroi , royality , Malkana, toll tax or other taxes but excluding GST imposed by the Government. | 4137.060 | Cubic meter |
| 5 | Providing and laying cement concrete 1:4:8 (one cement : four sand : eight graded crushed/broken stone aggregate 40 mm (forty millimetre nominal size) mechanically mixed and vibrated on ground or under water and curing complete including pumping or bailing out water, dewatering removal of shush as required at site which may arise at the time of laying under water complete for all heights and depths including cost of form work in open foundation complete as per drawing and technical specification clause 802,803,1202 and 1203 as per direction of Engineer-in- Charge including entire carriage of material within all leads lifts and other incidentals. The rates are inclusive octroi , royality , Malkana, toll tax or other taxes but excluding GST imposed by the Government | 593.620 | Cubic meter |