Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4619157 |
|---|---|
| Organisation Name | Municipal Council |
| Tender Brief | Corrigendum : Improvement Of Cc Road From Bus Stand To Ajay House At Birsa Nagar At Ward No.18. |
| Last Date For Submission | 29th Jun, 2026 |
| Opening Date | 29 Jun, 2026 |
| Document Cost | 0.00 |
|---|---|
| EMD | 6662.00 |
| Estimated Cost | 333090.00 |
| City | Multi city |
|---|---|
| State | Andaman and Nicobar Islands |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 29.180 | Cum |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 8.82 | Cum |
| 3 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns for mass concrete | 37.960 | Sqm |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 Cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 13.53 | Cum |
| 5 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.18 | Cum |
6 Days Left