Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3925917 |
|---|---|
| Organisation Name | NHPC Limited |
| Tender Brief | Corrigendum : Installation Of Obstacle Training Equipment At Cisf Unit Tld Iv Ps |
| Last Date For Submission | 1st May, 2026 |
| Opening Date | 06 May, 2026 |
| Document Cost | 590.00 |
|---|---|
| EMD | 6000.00 |
| Estimated Cost | 317737.00 |
| City | Multi city |
|---|---|
| State | Multi State |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete.(a) Depth of excavation not exceeding 1,500 mm | 0.7306 | % CUM |
| 2 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete (b) Depth of excavation for additional depth beyond 1,500 mm. and upto 3,000 mm. but not requiring shoring. | 0.025 | % CUM |
| 3 | Cement concrete with graded jhama khoa (30 mm size) excluding shuttering In ground floor and foundation- 1:3:6 proportion | 0.464 | CUM |
| 4 | Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes(b) River bazree | 9.721 | CUM |
| 5 | M.S. structural works in columns, beams etc. with simple rolled structural members (e.g. joists, angle,channel sections conforming to IS: 226, IS: 808 & SP (6)- 1964 connected to one another with bracket,gussets, cleats as per design, direction of Engineerincharge complete including cutting to requisite shape and length, fabrication with necessary bolting, metal arc welding electrodes of approved make and brand conforming to IS:814- 2004, haulage, hoisting and erection all complete. The rate includes the cost of rolled steel section, consumables such as electrodes, gas and hire charge of all tools and plants and labour required for the work including all incidental chages such as electricity charges, labour insurance charges etc.I) For structural members of specified sections weighing less than 22.5 Kg./m | 1.02980 | MT |
6 Days Left