| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Transportation, installation & commissioning of 8 Nos. pontoons, 6.88 Ton Weight each of blocks in Turra Main Sump , Turra North Sump & Purewa bottom sump before and during monsoon 2026 as per instruction of Engineer In Charge. (Note -Required Nut bolt and welding electrodes will be arranged by Contractor, MS steel material & gases will be provided by Bina Project, NCL ) | 8 | Job |
| 2 | Dismantling, transportation, stacking of 8 Nos. pontoons 6.88 Ton weight of 9 blocks in Turra main sump, Turra north sump & Purewa botton sump after monsoon 2026 as per instruction of Engineer In charge.(Note -Required Nut bolt and welding electrodes will be arranged by Contractor, MS steel material & gases will be provided by Bina Project, NCL ) | 8 | Job |
| 3 | Installation of pump motor set/ alignment of motor, field switch, starter as per requirement including fixing of suction pipe, moving unit, priming, testing etc with Loading and unloading of pump motor set and its accessories for installation before, during and after monsoon 2026 as per instruction of Engineer Incharge. (Note - Required welding electrode will be arranged by contractor & Gases will be provided by Bina Project, If required) | 10 | Job |
| 4 | Dismantling of pump motor set & other associated electrical equipments such as switch, starter etc as per requirement including suction pipe, moving unit, etc with Loading and unloading of pump motor set, starter, field switch and its accessories for placing at safe place during and after monsoon 2026 as per instruction of Engineer Incharge. (Gases and welding electrode will be provided by NCL, If required) | 10 | Job |
| 5 | Total impact of GST for the purpose of CTC | 1.000 | Nos |