Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Department Of Sugar
Tender ID3908441
Organisation NameDepartment Of Sugar
Tender BriefCorrigendum : Providing The Centrifugal Compressor Room
Last Date For Submission17th Apr, 2026
Opening Date17 Apr, 2026
Cost
Document Cost0.00
EMD8000.00
Estimated Cost0.00
Location
CityMulti city
StateTamil Nadu

Register to see full details

BOQ Items
#ItemQtyUnits
1Earth work excavation for foundation in all soils and sub soils to full depth as may be directed except hard rock requiring blasting but including shoring, strutting & baling out water wherever necessary including clearing spreading levelling refilling the sides of foundation with excavated earth in layers of not more than 15cms thick well rammed watered consolidated etc., including depositing the surplus earth with in the initial lead of 10 meters and lift of 2 meters etc., complete complying with the standard specifications and as directed by the departmental Engineers.10.00Cum
2Providing and laying plain cement concrete 1:5:10 (one cement 5 sand & 10 aggregate) using 40mm HBG stone jelly for foundation & flooring including consolidating curing dewatering if found necessary etc., complete complying with the standard specifications and as directed by the departmental Engineers.2.00Cum
3Supplying, fabricating and placing in position of MS/RTS rods required for reinforced cement concrete works including cost of steel conveyance from market and cleaning the rods, bending, straightenning, cutting, fabricating and tying grills in position including cost of 18 SWG binding wires, etc. complete with standard specification and as directed by the Engineers incharge of the work. (The steel rods and binding wire required for this work will be supplied by the contractor's own cost.)1.80Ton
4Providing and laying reinforced cement concrete 1:2:4 (one cement, 2 sand, 4 aggregate ) mix using 20mm HBG stone jelly approved quality centering structting and the cpst of reinforcement grills in position but including machine mixing laying ramming consolidating etc., using mechanical vibrators with all leads and lift for materials and concrete complete finishing curing & also fixing the fan clamps in RCC works wherever necessary etc. complying with the standard specification and as directed by the department Engineers.16.00Cum
5Centering with shuttering and soffits for reinforced cement concrete items complete complying with standard specifications100.00Sqm
17th Apr, 2026

3 Days Left

WhatsApp