Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3847541 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : Provision Of Six Toilet With Complete Electrical Fitting, One Soakage Pit And One Sewage Pit Against Job No 06 Rev Wk Hq 2 Sect Rr 2025-26 Under Age B R (p) Of Ge 861 Ews |
| Last Date For Submission | 23rd Apr, 2026 |
| Opening Date | 27 Apr, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 21000.00 |
| Estimated Cost | 1043000.00 |
| City | Multi city |
|---|---|
| State | Multi State |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Demolition cement concrete (unreinforced) in ground floor and pavings not exceeding 15cm thickness below or above ground level with and including removing rubbish material from building and thrown in low lying empty area complete all as specified and directed by Engineer-in-charge. | 6.08 | Cum |
| 2 | Excavating in trenches, not exceeding 1.5 m wide and not exceeding 1.5 m in depth; for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, cable, pipes etc. not exceeding 10 sqm on plan and not exceeding 1.5 m in depth and getting out in Soft/ Loose soil complete all as specified and as directed by Engineer-in- charge. | 32.88 | Cum |
| 3 | Material & Labour for Hardcore of broken stone or boulders ,gauge exceeding 63mm but not exceeding 100 mm, deposited, spread and levelled in layers not exceeding 15 cm thick, watered and rammed to a true surface complete all as specified and as directed by Engineer-in-Charge. | 4.32 | Cum |
| 4 | Material and labour for Cement Concrete 1:4:8 , Type D-2 using 40 mm graded stone aggregate as in foundation filling and mass concrete complete all as specified and as directed by Engineer-in-charge. | 2.58 | Cum |
| 5 | Material and labour for RCC M-25 (Design mix) using 20 mm graded stone aggregates as in foundations, including rafts, footings, foundation beams; plinth beams; bases for columns, etc.; basement slabs, under-reamed piles and mass concrete complete all as specified and as directed by Engineer-in-charge. NOTE : Reinforcement and form work shall be measured and paid for separately under appropriate item of this schedule. | 4.09 | Cum |
6 Days Left