Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3691945 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : Provn Of 01 X Toilet Block Against Job No. 24/rev/5s/2024-25 At Age B/r (p) Khanabal Under Ge 861 Ews |
| Last Date For Submission | 9th Apr, 2026 |
| Opening Date | 13 Apr, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 27200.00 |
| Estimated Cost | 1359000.00 |
| City | Multi city |
|---|---|
| State | Multi State |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Excavating in trenches, not exceeding 1.5 m wide and not exceeding 1.5 m in depth; for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, cable, pipes etc. not exceeding 10 sqm on plan and not exceeding 1.5 m in depth and getting out in any type soil complete all as specified and as directed by Engineer-in- charge. | 44.60 | Cum |
| 2 | Material & Labour for PCC 1:4:8 , Type - D2, using 40mm graded stone aggregates as in foundations, filling and mass concrete complete all as specified and directed by Engineer-in-Charge. | 4.00 | Cum |
| 3 | Material & Labour for Walling of random rubble stone , uncoursed , well bonded,bedded and solidly hearted built in cement mortar 1:6 complete all as specified and directed by Engineer-in-Charge. | 6.60 | Cum |
| 4 | Material & Labour for Reinforced cement concrete (Design Mix) M-25 as in foundations, including rafts, footings, foundation beams; plinth beams; bases for columns, etc.; basement slabs, under-reamed piles and mass concrete complete all as specified and as directed by Engineer-in-Charge.NOTE :- Form work and Steel reinforcement shall be measured and paid seperately under appropriate items of Schedule 'A' BoQ.seperate items. | 2.50 | Cum |
| 5 | Material & Labour for Reinforced cement concrete (Design Mix) M-25 as in Beams, cantilevers, bressummers, lintels over 1.5m span complete all as specified and directed by Engineer-in-Charge.NOTE :- Form work and Steel reinforcement shall be measured and paid seperately under appropriate items of Schedule 'A' BoQ.seperate items. | 2.30 | Cum |
6 Days Left